Legend: 122Newt: Newton focus of the 1.22 m (f/6) reflector 122Cass: Cassegrain focus of the 1.22 m (f/15) reflector 182 : Cassegrain focus of the 1.82 m (f/9) reflector Sc67/92: Schmidt telescope (67 cm correcting plate, 92 cm mirror, 205 cm focal length) Sc40/50: Schmidt telescope (40 cm correcting plate, 50 cm mirror, 102 cm focal length)
YY MM DD hh.mm.ss plate telesc. emulsion filter expt M31-RV lim.mag number detection 1942 10 29 ??.??.?? 68 122Newt Agfa astro ---- 30m no V=17.9 1942 11 07 ??.??.?? 70 122Newt Fsuperex ---- 18m no V=17.9 1942 11 27 ??.??.?? 79 122Newt Fsuperex ---- 100m no V=19.7 1955 09 22 02.39.00 1839 122Newt 103a-O ---- 30m no B=19.9 1955 09 23 01.43.00 1849 122Newt 103a-O ---- 30m no B=20.2 1955 09 25 00.55.00 1854 122Newt 103a-O ---- 30m no B=20.2 1955 12 09 20.33.15 1974 122Newt 103a-O ---- 30m no B=20.2 1955 12 11 21.13.00 1982 122Newt 103a-O ---- 40m no B=19.9 1955 12 16 21.20.00 1991 122Newt 103a-O ---- 40m no B=19.9 1956 02 02 20.42.00 2016 122Newt 103a-O ---- 24m no B=17.8 1956 02 17 18.29.00 2062 122Newt 103a-E ---- 60m no R=16.8 1956 07 06 01.30.00 2281 122Newt 103a-O ---- 34m no B=19.8 1956 07 09 01.24.00 2284 122Newt 103a-O ---- 50m no B=19.3 1956 07 15 01.27.00 2289 122Newt 103a-O ---- 40m no B=19.3 1956 07 16 00.15.00 2291 122Newt 103a-O ---- 07m no B=18.0 1956 07 18 01.18.00 2294 122Newt 103a-O ---- 37m no B=19.8 1956 08 08 02.36.00 2316 122Newt 103a-O ---- 20m no B=19.9 1956 08 10 02.26.00 2332 122Newt 103a-O ---- 40m no B=19.9 1956 09 06 02.30.00 2372 122Newt 103a-O ---- 40m no B=19.9 1956 09 09 01.19.00 2396 122Newt 103a-O ---- 40m no B=20.4 1956 09 11 01.40.00 2410 122Newt 103a-O ---- 40m no B=20.4 1956 09 14 00.41.00 2436 122Newt 103a-O ---- 30m no B=19.8 1956 09 16 02.44.00 2442 122Newt 103a-O ---- 40m no B=19.9 1956 10 02 22.35.00 2521 122Newt 103a-O ---- 40m no B=20.4 1956 10 06 21.16.00 2534 122Newt 103a-O ---- 40m no B=19.8 1956 10 12 01.20.00 2604 122Newt 103a-O ---- 35m no B=19.9 1956 10 13 00.55.00 2617 122Newt 103a-O ---- 40m no B=19.8 1956 10 14 00.48.00 2630 122Newt 103a-O ---- 40m no B=19.9 1956 10 22 18.20.00 2639 122Newt 103a-O ---- 15m no B=18.2 1956 10 23 18.04.00 2647 122Newt 103a-O ---- 50m no B=20.2 1956 10 28 20.20.00 2666 122Newt 103a-O ---- 25m no B=17.8 1956 11 04 22.00.00 2670 122Newt 103a-O ---- 40m no B=19.3 1956 11 08 21.09.00 2688 122Newt 103a-O ---- 40m no B=20.4 1956 11 26 18.54.00 2719 122Newt 103a-O ---- 40m no B=19.3 1956 11 28 22.14.00 2727 122Newt 103a-O ---- 40m no B=20.2 1956 11 30 23.30.00 2728 122Newt 103a-O ---- 40m no B=19.9 1956 12 02 19.37.00 2745 122Newt 103a-O ---- 40m no B=19.3 1956 12 04 18.23.00 2029 122Newt 103a-O ---- 60m no B=19.9 1956 12 06 21.57.00 2747 122Newt 103a-O ---- 50m no B=19.9 1956 12 07 21.43.30 2748 122Newt 103a-O ---- 27m no B=18.6 1956 12 24 18.23.00 2757 122Newt 103a-O ---- 40m no B=18.2 1956 12 28 18.43.00 2762 122Newt 103a-O ---- 40m no B=19.9 1956 12 29 23.52.00 2765 122Newt 103a-O ---- 36m no B=18.6 1957 01 03 22.05.30 2767 122Newt 103a-O ---- 40m no B=19.9 1957 01 07 18.46.00 2787 122Newt 103a-O ---- 30m no B=18.4 1957 01 08 18.46.00 2796 122Newt 103a-O ---- 20m no B=18.4 1957 06 25 01.17.00 2970 122Newt 103a-O ---- 30m no B=19.3 1957 06 27 01.12.00 2974 122Newt 103a-O ---- 40m no B=18.6 1957 06 28 00.57.00 2981 122Newt 103a-O ---- 40m no B=18.6 1957 06 29 01.37.00 2986 122Newt 103a-O ---- 22m no B=19.3 1957 07 01 00.45.30 2996 122Newt 103a-O ---- 40m no B=19.8 1957 07 03 00.44.00 3005 122Newt 103a-O ---- 40m no B=19.3 1957 07 08 00.54.00 3017 122Newt 103a-O ---- 40m no B=19.3 1957 07 22 01.16.00 3023 122Newt 103a-O ---- 40m no B=19.9 1957 07 24 02.04.00 3030 122Newt 103a-O ---- 35m no B=18.4 1957 07 29 00.54.00 3048 122Newt 103a-O ---- 40m no B=19.8 1957 07 31 02.03.00 3053 122Newt 103a-O ---- 40m no B=19.9 1957 08 02 23.27.00 3069 122Newt 103a-O ---- 40m no B=19.9 1957 08 25 01.51.00 3084 122Newt 103a-O ---- 45m no B=20.2 1957 08 28 22.01.00 3091 122Newt 103a-O ---- 40m no B=19.8 1957 09 01 01.45.00 3116 122Newt 103a-O ---- 40m no B=20.4 1957 09 05 03.01.00 3130 122Newt 103a-O ---- 30m no B=19.8 1957 09 16 19.54.00 3131 122Newt 103a-O ---- 40m no B=19.3 1957 09 19 22.13.00 3146 122Newt 103a-O ---- 15m no B=19.9 1957 09 20 23.40.00 3149 122Newt 103a-O ---- 38m no B=20.2 1957 10 13 20.07.00 3152 122Newt 103a-O ---- 30m no B=19.8 1957 10 15 21.46.00 3153 122Newt 103a-O ---- 30m no B=19.3 1957 10 17 00.19.00 3158 122Newt 103a-O ---- 40m no B=19.8 1957 10 18 01.39.00 3163 122Newt 103a-O ---- 60m no B=18.6 1957 10 19 00.42.30 3167 122Newt 103a-O ---- 40m no B=20.2 1957 10 24 00.04.00 3171 122Newt 103a-O ---- 35m no B=19.9 1957 10 25 00.34.00 3181 122Newt 103a-O ---- 35m no B=19.8 1957 10 25 19.45.00 3190 122Newt 103a-O ---- 30m no B=19.9 1957 10 27 18.41.00 3211 122Newt 103a-O ---- 30m no B=19.9 1957 10 29 21.53.00 3226 122Newt 103a-O ---- 40m no B=20.4 1957 11 16 22.29.00 3235 122Newt 103a-O ---- 40m no B=20.2 1957 11 17 21.05.00 3242 122Newt 103a-O ---- 40m no B=19.8 1957 11 19 17.55.00 3248 122Newt 103a-O ---- 40m no B=19.8 1957 11 24 20.15.00 3255 122Newt 103a-O ---- 40m no B=20.4 1957 11 25 18.21.00 3258 122Newt 103a-O ---- 40m no B=20.2 1957 11 26 20.18.00 3263 122Newt 103a-O ---- 40m no B=20.4 1957 11 27 20.22.00 3271 122Newt 103a-O ---- 40m no B=19.8 1957 12 21 19.58.00 3285 122Newt 103a-O ---- 40m no B=20.2 1957 12 26 18.58.00 3299 122Newt 103a-O ---- 40m no B=19.9 1958 01 18 19.15.00 3365b 122Newt 103a-O ---- 30m no B=19.8 1958 01 19 17.46.00 3374 122Newt 103a-O ---- 40m no B=18.4 1958 01 21 19.05.00 3381 122Newt 103a-O ---- 40m no B=18.3 1958 01 23 18.47.00 3386 122Newt 103a-O ---- 40m no B=19.3 1958 01 25 18.39.00 3400 122Newt 103a-O ---- 40m no B=19.3 1958 01 26 18.01.00 3408 122Newt 103a-O ---- 40m no B=19.3 1958 01 27 18.46.00 3419 122Newt 103a-O ---- 30m no B=18.3 1958 01 28 18.26.00 3425 122Newt 103a-O ---- 20m no B=18.2 1958 02 14 18.43.00 3435 122Newt 103a-O ---- 45m no B=19.9 1958 08 15 00.45.00 3551 122Newt 103a-O ---- 45m no B=20.2 1958 08 16 22.21.00 3554 122Newt 103a-O ---- 12m no B=17.8 1958 08 16 23.02.00 3555 122Newt 103a-O ---- 45m no B=19.9 1958 08 18 22.40.00 3567 122Newt 103a-O ---- 40m no B=19.8 1958 08 20 22.57.00 3570 122Newt 103a-O ---- 38m no B=18.4 1958 09 06 01.47.00 3577 122Newt 103a-O ---- 30m no B=19.3 1958 09 06 ??.??.?? 28 Sc40/50 103a-O ---- 20m no B=17.9 1958 09 08 02.35.00 3593 122Newt 103a-O ---- 30m no B=18.6 1958 09 09 00.32.00 3598 122Newt 103a-O ---- 40m no B=19.9 1958 09 11 22.36.00 3600 122Newt 103a-O ---- 48m no B=18.0 1958 09 13 23.32.00 3603 122Newt 103a-O ---- 40m no B=19.9 1958 09 15 01.10.00 3606 122Newt 103a-O ---- 40m no B=19.9 1958 09 16 00.19.00 3609 122Newt 103a-O ---- 38m no B=20.2 1958 09 16 00.51.00 3610 122Newt 103a-O ---- 12m no B=18.8 1958 09 22 23.32.00 3614 122Newt 103a-O ---- 40m no B=18.4 1958 09 22 23.53.00 3615 122Newt 103a-O ---- 10m no B=18.3 1958 10 06 22.56.00 3621 122Newt 103a-O ---- 40m no B=18.4 1958 10 09 01.58.00 3624 122Newt 103a-O ---- 40m no B=20.4 1958 10 09 02.35.00 3625 122Newt 103a-O ---- 20m no B=19.3 1958 10 10 22.33.00 3628 122Newt 103a-O ---- 40m no B=19.8 1958 10 13 23.04.00 3634 122Newt 103a-O ---- 40m no B=18.6 1958 10 13 23.27.00 3635 122Newt 103a-O ---- 15m no B=17.9 1958 10 14 22.37.00 50 Sc40/50 103a-O ---- 30m no B=17.2 1958 10 18 19.15.00 3641 122Newt 103a-O ---- 40m no B=18.6 1958 12 03 18.00.00 3657 122Newt 103a-O ---- 40m no B=18.8 1958 12 03 18.28.00 3658 122Newt 103a-O ---- 15m no B=18.2 1958 12 06 19.54.00 3670 122Newt 103a-O ---- 15m no B=19.8 1958 12 06 20.31.00 3671 122Newt 103a-O ---- 40m no B=20.2 1958 12 07 19.33.00 3687 122Newt 103a-O ---- 40m no B=20.4 1958 12 07 20.00.00 3688 122Newt 103a-O ---- 10m no B=19.3 1958 12 07 20.16.00 3689 122Newt 103a-O ---- 15m no B=19.9 1958 12 08 21.17.00 3702 122Newt 103a-O ---- 10m no B=19.8 1958 12 08 21.50.00 3703 122Newt 103a-O ---- 40m no B=19.3 1958 12 10 17.07.00 3720 122Newt 103a-O ---- 15m no B=19.8 1958 12 10 17.36.00 3721 122Newt 103a-O ---- 40m no B=19.3 1958 12 29 19.01.00 3726 122Newt 103a-O ---- 12m no B=20.2 1958 12 29 19.29.00 3727 122Newt 103a-O ---- 40m no B=19.9 1958 12 30 18.14.00 3730 122Newt 103a-O ---- 12m no B=18.4 1958 12 30 18.40.00 3731 122Newt 103a-O ---- 40m no B=20.2 1959 01 01 18.20.00 3732 122Newt 103a-O ---- 50m no B=19.8 1959 01 01 18.57.00 3733 122Newt Scie67A50 ---- 15m no B=18.4 1959 01 03 ??.??.?? 3739 122Newt 103a-O ---- 20m no B=19.8 1959 01 04 19.00.00 3740 122Newt 103a-O ---- 40m no B=19.3 1959 01 05 20.02.00 3748 122Newt 103a-O ---- 40m no B=18.6 1959 01 05 20.32.00 3749 122Newt 103a-O ---- 15m no B=18.4 1959 01 06 17.35.00 3753 122Newt 103a-O ---- 12m no B=18.6 1959 01 06 18.05.00 3754 122Newt 103a-O ---- 40m no B=19.8 1959 01 09 18.26.00 3756 122Newt 103a-O ---- 40m no B=18.4 1959 01 09 18.56.00 3757 122Newt 103a-O ---- 15m no B=19.8 1959 01 11 20.38.00 3766 122Newt 103a-O ---- 40m no B=18.6 1959 01 11 21.07.00 3767 122Newt 103a-O ---- 15m no B=18.6 1959 01 12 19.18.00 3769 122Newt 103a-O ---- 40m no B=18.6 1959 01 12 20.47.00 3770 122Newt 103a-O ---- 15m no B=19.9 1959 02 11 18.02.00 3806 122Newt 103a-O ---- 15m no B=19.3 1959 02 11 18.31.00 3807 122Newt 103a-O ---- 40m no B=19.8 1959 07 10 01.21.00 3912 122Newt 103a-O ---- 36m no B=19.9 1959 07 12 01.41.00 3917 122Newt 103a-O ---- 37m no B=19.8 1959 08 05 00.30.00 3919 122Newt Scie67A50 ---- 30m no B=20.2 1959 08 27 00.45.00 3925 122Newt 103a-O ---- 30m no B=19.3 1959 08 28 01.24.00 3929 122Newt 103a-O ---- 16m no B=17.8 1959 09 06 22.28.00 3931 122Newt Scie67A50 ---- 40m no B=18.6 1959 09 08 22.45.00 3934 122Newt Scie67A50 ---- 30m no B=19.9 1959 09 10 00.55.00 3935 122Newt 103a-O ---- 30m no B=19.9 1959 09 11 01.35.00 3938 122Newt 103a-O ---- 15m no B=20.2 1959 09 11 02.02.00 3939 122Newt 103a-O ---- 30m no B=20.2 1959 09 22 20.45.00 3942 122Newt 103a-O ---- 20m no B=17.8 1959 10 01 19.48.00 3943 122Newt 103a-O ---- 30m no B=19.3 1959 10 04 23.24.00 3946 122Newt 103a-O ---- 40m no B=20.4 1959 10 04 23.54.00 3947 122Newt 103a-O ---- 15m no B=19.8 1959 10 06 20.28.00 3952 122Newt 103a-O ---- 40m no B=19.3 1959 10 06 20.55.00 3953 122Newt 103a-O ---- 12m no B=18.6 1959 10 09 00.41.00 3987 122Newt 103a-O ---- 40m no B=20.2 1959 10 09 00.54.00 3988 122Newt 103a-O ---- 12m no B=19.8 1959 10 23 21.14.00 3992 122Newt 103a-O ---- 40m no B=19.3 1959 10 23 21.40.00 3993 122Newt 103a-O ---- 12m no B=18.6 1959 10 25 20.29.00 3999 122Newt 103a-O ---- 40m no B=19.9 1959 10 25 20.56.00 4000 122Newt 103a-O ---- 12m no B=18.6 1959 10 30 19.52.00 4003 122Newt 103a-O ---- 40m no B=19.9 1959 10 30 20.19.00 4004 122Newt 103a-O ---- 12m no B=18.6 1959 11 23 20.39.00 4016 122Newt 103a-O ---- 40m no B=19.9 1959 12 28 21.44.00 4030 122Newt 103a-O ---- 40m no B=18.6 1959 12 28 22.31.00 4031 122Newt 103a-O ---- 10m no B=17.8 1959 12 30 18.57.00 4035 122Newt 103a-O ---- 30m no B=18.2 1960 08 19 22.55.00 4124 122Newt 103a-O ---- 40m no B=19.9 1960 08 26 23.50.00 4133 122Newt 103a-O ---- 40m no B=20.2 1960 08 27 00.27.00 4134 122Newt 103a-O ---- 25m no B=19.9 1960 08 27 23.10.00 4135 122Newt 103a-O ---- 27m no B=20.2 1960 08 28 00.18.00 4136 122Newt SuperAnsco ---- 60m no V=15.2 1960 08 28 01.04.00 4137 122Newt SuperAnsco ---- 30m no V=16.5 1960 08 28 01.27.00 4138 122Newt SuperAnsco ---- 15m -- ------ 1960 08 28 01.40.00 4139 122Newt SuperAnsco ---- 07.5m -- ------ 1960 08 28 01.51.00 4140 122Newt SuperAnsco ---- 03.45m -- ------ 1960 08 29 00.21.00 4145 122Newt 103a-O ---- 40m no B=19.8 1960 08 30 00.35.00 4148 122Newt 103a-O ---- 45m no B=19.3 1960 09 12 22.25.00 4156 122Newt 103a-O ---- 40m no B=19.8 1960 09 22 21.20.00 4159 122Newt 103a-O ---- 40m no B=20.2 1960 09 22 22.00.00 4160 122Newt 103a-O ---- 20m no B=19.8 1960 10 13 18.42.00 4189 122Newt 103a-O ---- 40m no B=19.3 1960 10 13 20.31.00 4190 122Newt 103a-F Halp- 40m no R=16.9 1960 10 13 21.23.00 4191 122Newt 103a-E Halp+ 40m no R=16.7 1960 10 15 18.25.00 4199 122Newt 103a-O ---- 40m no B=19.9 1960 10 17 18.47.00 4202 122Newt 103a-O ---- 40m no B=19.9 1960 10 18 19.00.00 4208 122Newt 103a-O ---- 40m no B=19.9 1960 10 19 22.35.00 4210 122Newt 103a-O ---- 35m no B=19.8 1960 10 22 00.15.00 4213 122Newt 103a-O ---- 30m no B=19.3 1960 10 26 22.35.00 4217 122Newt 103a-O ---- 40m no B=18.6 1960 11 12 21.54.00 4220 122Newt 103a-O ---- 40m no B=19.9 1960 11 14 21.26.00 4225 122Newt 103a-O ---- 40m no B=19.8 1960 11 16 22.58.00 4231 122Newt 103a-O ---- 40m no B=19.3 1960 11 17 22.10.00 4236 122Newt 103a-O ---- 40m no B=19.9 1960 11 18 22.05.00 4242 122Newt 103a-O ---- 34m no B=18.8 1960 11 20 17.48.00 4243 122Newt 103a-O ---- 40m no B=19.9 1960 11 20 18.33.00 4244 122Newt INsens RG5 40m no I=18.4 1960 11 26 17.37.00 4258 122Newt 103a-O ---- 25m no B=18.6 1960 11 27 00.48.00 4261 122Newt 103a-O ---- 40m no B=19.3 1960 12 14 22.13.00 4265 122Newt 103a-O ---- 40m no B=18.6 1960 12 15 19.24.00 4266 122Newt 103a-O ---- 40m no B=20.4 1960 12 21 17.24.00 4271 122Newt 103a-O ---- 40m no B=19.9 1960 12 23 20.33.00 4283 122Newt 103a-O ---- 40m no B=19.3 1960 12 25 23.32.00 4293 122Newt 103a-O ---- 20m no B=18.8 1961 01 07 20.01.00 4298 122Newt 103a-O ---- 30m no B=18.8 1961 01 09 19.51.00 4311 122Newt 103a-O ---- 44m no B=19.9 1961 01 18 19.41.00 4346 122Newt 103a-O ---- 40m no B=19.8 1961 02 03 18.15.00 4379 122Newt 103a-O ---- 40m no B=20.1 1961 02 07 20.32.00 4381 122Newt 103a-O ---- 40m no B=19.8 1961 02 08 20.25.00 4383 122Newt 103a-O ---- 40m no B=18.2 1961 02 15 18.39.00 4404 122Newt 103a-O ---- 40m no B=19.8 1961 02 16 21.22.00 4409 122Newt 103a-O ---- 40m no B=19.8 1961 02 19 21.44.00 4418 122Newt 103a-O ---- 40m no B=17.8 1961 02 20 19 48.00 4419 122Newt Scie67A50 ---- 40m no B=17.8 1961 02 24 18.30.00 4420 122Newt Scie67A50 ---- 30m no B=18.4 1961 03 05 19.05.00 4425 122Newt Scie67A50 ---- 40m no B=19.8 1961 03 06 18.48.00 4429 122Newt Scie67A50 ---- 40m no B=20.2 1961 03 08 18.45.00 4433 122Newt Scie67A50 ---- 40m no B=20.2 1961 03 09 18.57.00 4435 122Newt Scie67A50 ---- 40m no B=18.4 1961 03 10 19.04.00 4439 122Newt Scie67A50 ---- 40m no B=17.2 1961 03 12 19.45.00 4445 122Newt Scie67A50 ---- 30m no B=18.2 1961 03 16 19.18.00 4453 122Newt Scie67A50 ---- 40m no B=17.8 1961 03 20 19.05.00 4454 122Newt Scie67A50 ---- 40m no B=17.8 1961 08 05 01.48.00 4436 122Newt 103a-O ---- 25m no B=19.9 1961 08 09 01.48.00 4557 122Newt 103a-O ---- 40m no B=20.2 1961 08 18 00.53.00 4580 122Newt 103a-O ---- 40m no B=18.6 1961 09 03 21.40.00 2008 Sc40/50 103a-O ---- 20m no B=17.8 1961 09 03 22.10.00 2009 Sc40/50 PanRoy ---- 30m no V=16.5 1961 09 05 00.09.00 4584 122Newt 103a-O ---- 40m no B=19.9 1961 09 11 02.20.00 4619 122Newt 103a-O ---- 30m no B=19.9 1961 09 16 02.17.00 4628 122Newt 103a-O ---- 40m no B=20.2 1961 09 17 20.45.00 4638 122Newt 103a-O ---- 40m no B=19.8 1961 09 28 19.40.00 4657 122Newt 103a-O ---- 40m no B=18.8 1961 10 02 22.26.00 4692 122Newt Ferr2A ---- 40m no B=20.4 1961 10 09 22.53.00 4670 122Newt 103a-O GG13 40m no B=19.8 1961 10 10 23.15.00 4672 122Newt Ferr2A ---- 30m no B=20.4 1961 10 11 22.46.00 4687 122Newt Ferr2A GG13 30m no B=19.9 1961 10 12 22.55.00 4693 122Newt Ferr2A ---- 10m no B=19.3 1961 10 15 23.11.00 4703 122Newt Ferr2A ---- 40m no B=19.3 1961 10 15 23.42.00 4704 122Newt Ferr2A ---- 10m no B=17.8 1961 10 31 22.33.00 4721 122Cass Ferr2A ---- 60m no B=17.8 1961 11 03 00.57.00 4738 122Newt Ferr2A ---- 20m no B=19.8 1961 11 15 18.00.00 4742 122Newt Ferr2A ---- 40m no B=20.2 1961 11 17 00.06.00 2223 Sc40/50 103a-O ---- 10m no B=17.8 1961 11 17 00.41.00 2224 Sc40/50 103a-E RG1 30m no R=16.6 1961 11 17 01.34.00 4760 122Newt Ferr2A ---- 40m no B=20.2 1961 11 19 02.42.00 4776 122Newt Ferr2A ---- 20m no B=19.8 1961 11 19 03.19.00 4777 122Newt Ferr2A ---- 40m no B=19.3 1961 11 28 17.35.00 4783 122Newt Ferr2A ---- 40m no B=20.4 1961 11 28 18.06.00 4784 122Newt Ferr2A ---- 20m no B=19.8 1961 12 07 21.27.00 4791 122Newt Ferr2A ---- 40m no B=18.6 1961 12 12 21.34.00 4813 122Newt Ferr2A ---- 40m no B=18.4 1961 12 12 22.08.00 4814 122Newt Ferr2A ---- 20m no B=18.6 1962 01 04 21.05.00 4824 122Newt Ferr2A ---- 40m no B=19.9 1962 01 07 17.47.00 4832 122Newt Ferr2A ---- 40m no B=20.2 1962 01 09 19.11.00 4841 122Newt Ferr2A ---- 28m no B=18.6 1962 01 25 20.18.00 4845 122Newt Ferr2A ---- 30m no B=19.3 1962 01 27 18.44.00 4848 122Newt Ferr2A ---- 30m no B=19.8 1962 01 29 18.20.00 4856 122Newt Ferr2A ---- 30m no B=18.6 1962 02 02 21.33.00 4882 122Newt 103a-O ---- 30m no B=18.6 1962 02 04 18.26.00 2574 Sc40/50 103a-E RG1 30m no R=16.6 1962 02 05 20.34.30 4898 122Newt Ferr2A ---- 41m no B=18.2 1962 02 11 18.40.00 4906 122Newt 103a-O ---- 20m no B=18.2 1962 02 11 19.08.00 4907 122Newt 103a-O GG13 20m no B=18.2 1962 02 24 18.41.00 4916 122Newt Ferr2A ---- 30m no B=17.8 1962 03 08 18.52.00 4922 122Newt Ferr2A ---- 30m no B=17.2 1962 06 29 01.24.00 5093 122Newt Ferr2A ---- 25m no B=18.6 1962 07 02 01.26.00 5096 122Newt Ferr2A ---- 30m no B=18.0 1962 07 03 01.23.00 5106 122Newt Ferr2A ---- 30m no B=19.8 1962 07 07 01.45.00 5109 122Newt Ferr2A ---- 15m no B=17.8 1962 07 09 00.44.00 5118 122Newt Ferr2A ---- 40m no B=20.1 1962 07 09 01.15.00 5119 122Newt Ferr2A ---- 20m no B=18.8 1962 07 11 01.42.00 5126 122Newt Ferr2A ---- 30m no B=19.3 1962 07 23 22.57.00 5134 122Newt Ferr2A ---- 25m no B=20.1 1962 07 24 23.27.00 5139 122Newt LS 61 ---- 30m no B=20.2 1962 07 25 23.22.00 5143 122Newt 103a-O ---- 40m no B=20.2 1962 07 26 23.17.00 5149 122Newt Ferr2A ---- 40m no B=19.9 1962 07 26 23.17.00 5149 122Newt Ferr2A ---- 40m no B=20.1 1962 07 27 00.47.00 5150 122Newt Ferr2A ---- 15m no B=19.8 1962 07 27 23.53.00 5156 122Newt Ferr2A ---- 40m no B=19.9 1962 07 28 00.21.00 5157 122Newt Ferr2A ---- 15m no B=20.4 1962 08 01 00.13.00 5164 122Newt Ferr2A ---- 40m no B=19.8 1962 08 01 00.46.00 5165 122Newt Ferr2A ---- 20m no B=20.4 1962 08 01 23.58.00 5171 122Newt Ferr2A ---- 30m no B=20.4 1962 08 02 00.31.00 5172 122Newt Ferr2A ---- 15m no B=19.8 1962 08 04 00.14.00 5180 122Newt Ferr2A ---- 35m no B=19.8 1962 08 04 00.41.00 5181 122Newt Ferr2A ---- 15m no B=19.8 1962 08 05 23.48.00 5182 122Newt Ferr2A ---- 20m no B=19.9 1962 08 08 00.28.00 5183 122Newt Ferr2A ---- 30m no B=19.8 1962 08 08 23.22.00 5184 122Newt Ferr2A ---- 40m no B=19.9 1962 08 11 01.50.00 5186 122Newt Ferr2A ---- 30m no B=19.9 1962 08 11 02.25.00 5187 122Newt 103a-D GG11 30m no V=19.3 1962 08 12 02.42.00 3024 Sc40/50 103a-O ---- 15m no B=17.8 1962 08 20 23.17.00 5191 122Newt Ferr2A ---- 30m no B=18.1 1962 08 20 23.40.00 5192 122Newt Ferr2A ---- 15m no B=17.8 1962 08 23 22.50.00 5203 122Newt Ferr2A ---- 40m no B=20.2 1962 08 23 23.19.00 5204 122Newt Ferr2A ---- 15m no B=19.8 1962 08 24 23.29.00 5213 122Newt Ferr2A ---- 40m no B=20.2 1962 08 24 23.57.00 5214 122Newt Ferr2A ---- 15m no B=19.3 1962 08 26 22.29.00 5226 122Newt Ferr2A ---- 15m no B=20.2 1962 08 26 23.01.00 5225 122Newt Ferr2A ---- 40m no B=19.9 1962 08 28 23.46.00 5232 122Newt Ferr2A ---- 30m no B=19.8 1962 08 30 00.20.00 5234 122Newt Ferr2A ---- 40m no B=19.9 1962 08 30 00.48.00 5235 122Newt Ferr2A ---- 15m no B=19.8 1962 08 31 00.13.00 5241 122Newt Ferr2A ---- 40m no B=19.8 1962 09 01 00.06.00 5246 122Newt Ferr2A ---- 40m no B=20.2 1962 09 01 00.34.00 5247 122Newt Ferr2A ---- 15m no B=19.8 1962 09 03 00.03.00 5250 122Newt Ferr2A ---- 30m no B=19.9 1962 09 03 22.43.00 5258 122Newt Ferr2A ---- 40m no B=18.8 1962 09 03 23.52.00 5259 122Newt 103a-D GG11 30m no V=19.5 1962 09 04 00.10.00 5260 122Newt LS 61 ---- 10m no B=17.8 1962 09 05 01.35.00 5261 122Newt LS 61 ---- 05m no B=17.8 1962 09 05 21.18.00 5263 122Newt LS 61 ---- 08m no B=17.8 1962 09 05 23.21.00 5264 122Newt LS 61 ---- 40m no B=19.8 1962 09 07 01.08.00 5265 122Newt LS 61 ---- 30m no B=19.9 1962 09 07 01.27.00 5266 122Newt LS 61 ---- 05m no B=16.6 1962 09 07 23.33.00 5267 122Newt LS 61 ---- 40m no B=19.8 1962 09 10 01.41.00 3079 Sc40/50 103a-O ---- 15m no B=17.8 1962 09 21 21.14.00 3098 Sc40/50 103a-O ---- 15m no B=17.2 1962 09 22 22.41.00 5310 122Newt LS 61 ---- 15m no B=19.3 1962 09 25 23.36.00 5322 122Newt LS 61 ---- 30m no B=19.8 1962 09 29 23.28.00 5329 122Newt LS 61 ---- 30m no B=18.8 1962 09 30 23.13.00 3148 Sc40/50 103a-E RG1 30m no R=16.9 1962 09 30 23.25.00 5339 122Newt LS 61 ---- 30m no B=20.1 1962 10 01 23.20.00 5348 122Newt LS 61 ---- 30m no B=20.2 1962 10 02 00.12.00 3163 Sc40/50 103a-O ---- 15m no B=17.8 1962 10 02 23.23.00 3172 Sc40/50 103a-E RG1 30m no R=16.8 1962 10 03 03.00.00 5336 122Newt LS 61 ---- 30m no B=20.4 1962 10 03 22.24.00 5358 122Newt LS 61 ---- 40m no B=20.2 1962 10 03 22.52.00 5359 122Newt LS 61 ---- 15m no B=20.1 1962 10 03 23.12.00 3182 Sc40/50 103a-O ---- 15m no B=17.8 1962 10 04 22.39.00 5371 122Newt LS 61 ---- 30m no B=20.4 1962 10 04 23.27.00 3191 Sc40/50 103a-E RG1 40m no B=16.6 1962 10 09 00.12.00 3196 Sc40/50 103a-O ---- 15m no B=18.2 1962 10 09 00.17.00 5385 122Newt LS 61 ---- 40m no B=19.9 1962 10 09 00.48.00 5386 122Newt LS 61 ---- 12m no B=19.8 1962 10 10 02.19.00 5392 122Newt LS 61 ---- 25m no B=19.8 1962 10 17 19.09.00 3209 Sc40/50 103a-O ---- 20m no B=17.8 1962 10 19 18.48.00 5396 122Newt 103a-O ---- 20m no B=19.3 1962 10 19 19.19.00 5397 122Newt 103a-O ---- 40m no B=19.8 1962 10 22 19.25.00 5402 122Newt IIa-O ---- 40m no B=20.1 1962 10 22 19.47.00 3227 Sc40/50 103a-O ---- 15m no B=17.2 1962 10 22 19.56.00 5403 122Newt LS 61 ---- 15m no B=19.8 1962 10 23 20.48.00 5413 122Newt LS 61 ---- 30m no B=20.4 1962 10 23 21.27.00 5414 122Newt LS 61 ---- 15m no B=19.9 1962 10 24 19.33.00 5422 122Newt LS 61 ---- 30m no B=20.4 1962 10 24 23.52.00 5429 122Newt IIa-O ---- 20m no B=20.4 1962 10 26 19.20.00 5433 122Newt LS 61 ---- 30m no B=20.2 1962 10 26 19.41.00 5434 122Newt LS 61 ---- 12m no B=19.8 1962 10 30 19.05.00 5447 122Newt IIa-O ---- 40m no B=20.4 1962 10 30 19.45.00 5448 122Newt IIa-O ---- 12m no B=19.8 1962 11 02 18.46.00 3273 Sc40/50 103a-O ---- 06m no B=16.5 1962 11 02 21.00.00 5464 122Newt IIa-O ---- 30m no B=20.4 1962 11 03 22.19.00 5475 122Newt IIa-O ---- 40m no B=19.8 1962 11 16 18.09.00 5482 122Newt LS 61 ---- 30m no B=20.1 1962 11 16 19.00.00 3296 Sc40/50 103a-E RG1 40m no R=17.1 1962 11 22 19.07.00 3300 Sc40/50 103a-O ---- 10m no B=18.2 1962 11 22 19.22.00 3301 Sc40/50 103a-O ---- 10m no B=17.8 1962 11 22 20.07.00 5489 122Newt LS 61 ---- 40m no B=19.9 1962 11 22 20.38.00 5490 122Newt LS 61 ---- 10m no B=19.8 1962 11 22 20.55.00 5491 122Newt LS 61 ---- 10m no B=19.8 1962 11 23 17.20.00 5504 122Newt LS 61 ---- 40m no B=18.4 1962 11 23 17.50.00 5505 122Newt LS 61 ---- 15m no B=19.8 1962 11 23 18.05.00 5506 122Newt LS 61 ---- 15m no B=18.6 1962 11 23 18.39.00 3313 Sc40/50 103a-O ---- 15m no B=17.8 1962 11 24 18.33.00 5513 122Newt LS 61 ---- 30m no B=17.8 1962 11 24 19.04.00 5514 122Newt LS 61 ---- 30m no B=20.4 1962 11 26 17.29.00 5526 122Newt LS 61 ---- 30m no B=19.9 1962 11 26 17.50.00 5527 122Newt LS 61 ---- 10m no B=20.1 1962 11 26 18.19.00 3340 Sc40/50 103a-O ---- 10m no B=17.8 1962 11 29 18.19.00 3349 Sc40/50 103a-O ---- 10m no B=18.2 1962 11 29 18.20.00 5530 122Newt LS 61 ---- 30m no B=20.4 1962 11 29 18.41.00 5531 122Newt LS 61 ---- 10m no B=20.1 1962 11 30 20.15.00 5536 122Newt LS 61 ---- 30m no B=20.1 1962 11 30 20.36.00 5537 122Newt LS 61 ---- 10m no B=20.2 1962 12 01 17.10.00 5551 122Newt LS 61 ---- 30m no B=20.2 1962 12 01 17.31.00 5552 122Newt LS 61 ---- 10m no B=20.2 1962 12 02 16.50.00 5555 122Newt LS 61 ---- 10m no B=18.4 1962 12 02 17.11.00 5556 122Newt LS 61 ---- 30m no B=18.4 1962 12 02 20.51.00 3390 Sc40/50 103a-O ---- 10m no B=17.8 1962 12 06 01.38.00 5560 122Newt LS 61 ---- 30m no B=18.6 1962 12 06 02.00.00 5561 122Newt LS 61 ---- 10m no B=18.6 1962 12 14 18.24.00 5565 122Newt LS 61 ---- 30m no B=19.8 1962 12 14 18.48.00 5566 122Newt LS 61 ---- 10m no B=19.8 1962 12 14 18.50.00 3442 Sc40/50 103a-O ---- 10m no B=17.2 1962 12 16 17.47.00 3449 Sc40/50 103a-O ---- 10m no B=17.8 1962 12 16 19.06.00 5570 122Newt LS 61 ---- 30m no B=18.2 1962 12 16 19.27.00 5571 122Newt LS 61 ---- 10m no B=18.4 1962 12 17 18.19.00 5574 122Newt LS 61 ---- 30m no B=19.9 1962 12 17 18.22.00 3458 Sc40/50 103a-E RG1 30m no R=16.8 1962 12 17 18.40.00 5575 122Newt LS 61 ---- 12m no B=19.3 1962 12 18 17.58.00 5578 122Newt LS 61 ---- 30m no B=20.2 1962 12 18 18.01.00 3468 Sc40/50 103a-O ---- 10m no B=17.8 1962 12 18 18.20.00 5579 122Newt LS 61 ---- 12m no B=20.2 1962 12 20 18.20.00 3485 Sc40/50 103a-O ---- 10m no B=17.8 1962 12 20 19.41.00 5587 122Newt LS 61 ---- 12m no B=18.6 1962 12 20 20.03.00 5588 122Newt LS 61 ---- 30m no B=19.8 1962 12 21 18.56.00 3495 Sc40/50 103a-O ---- 10m no B=17.2 1962 12 22 18.37.00 5604 122Newt LS 61 ---- 30m no B=20.1 1962 12 22 18.59.00 5605 122Newt LS 61 ---- 12m no B=20.4 1962 12 25 17.17.00 5620 122Newt LS 61 ---- 12m no B=19.9 1962 12 25 17.43.00 5621 122Newt LS 61 GG13 30m no B=19.9 1962 12 26 17.16.00 5624 122Newt LS 61 ---- 12m no B=19.9 1962 12 26 17.41.00 5625 122Newt LS 61 GG13 30m no B=20.4 1962 12 27 17.16.00 5632 122Newt LS 61 ---- 12m no B=20.4 1963 01 14 17.33.00 5640 122Newt LS 61 ---- 20m no B=18.6 1963 01 15 17.35.00 5645 122Newt LS 61 ---- 12m no B=20.2 1963 01 15 18.00.00 5646 122Newt LS 61 GG13 30m no B=20.1 1963 01 16 17.55.00 5652 122Newt LS 61 GG13 30m no B=19.3 1963 01 16 18.28.00 5651 122Newt LS 61 ---- 12m no B=19.8 1963 01 19 19.21.00 5657 122Newt LS 61 ---- 12m no B=19.8 1963 01 19 19.44.00 5658 122Newt LS 61 GG13 30m no B=20.1 1963 01 20 20.50.00 5672 122Newt 103a-O GG13 30m no B=19.3 1963 01 22 18.45.00 3620 Sc40/50 103a-O ---- 10m no B=17.8 1963 01 23 20.52.00 5689 122Newt LS 61 GG13 30m no B=19.3 1963 01 24 20.20.00 5704 122Newt LS 61 GG13 30m no B=19.8 1963 01 25 17.24.00 5707 122Newt LS 61 ---- 10m no B=19.9 1963 01 25 17.46.00 5708 122Newt LS 61 GG13 30m no B=20.4 1963 01 27 17.43.00 5717 122Newt LS 61 GG13 30m no B=18.6 1963 01 29 17.48.00 5745 122Newt LS 61 ---- 12m no B=18.6 1963 01 29 18.10.00 5746 122Newt LS 61 GG13 30m no B=20.2 1963 01 31 17.46.00 5748 122Newt LS 61 ---- 08m no B=18.4 1963 01 31 18.03.00 5749 122Newt LS 61 GG13 20m no B=17.2 1963 02 23 18.18.00 5753 122Newt LS 61 ---- 10m no B=17.8 1963 02 23 18.40.00 5754 122Newt LS 61 GG13 30m no B=17.8 1963 02 25 18.08.00 5765 122Newt LS 61 ---- 10m no B=17.2 1963 02 25 18.31.00 5766 122Newt LS 61 GG13 30m no B=18.2 1963 02 26 18.30.00 5777 122Newt LS 61 ---- 10m no B=18.8 1963 02 26 18.52.00 5778 122Newt LS 61 GG13 30m no B=19.9 1963 02 27 18.36.00 5789 122Newt LS 61 ---- 10m no B=17.8 1963 02 27 18.58.00 5790 122Newt LS 61 GG13 30m no B=17.8 1963 02 28 18.38.00 5792 122Newt LS 61 ---- 08m no B=17.8 1963 02 28 18.57.00 5793 122Newt LS 61 GG13 25m no B=17.8 1963 06 30 01.29.00 5861 122Newt LS 61 ---- 30m no B=19.8 1963 07 02 01.20.00 5866 122Newt 103a-O ---- 28m no B=20.4 1963 07 24 01.41.00 5885 122Newt 103a-O ---- 12m no B=19.9 1963 07 24 02.00.00 5886 122Newt 103a-O ---- 23m no B=19.9 1963 07 25 01.43.00 5890 122Newt 103a-O ---- 30m no B=20.2 1963 08 01 00.46.00 5902 122Newt 103a-O ---- 40m no B=20.2 1963 08 01 01.19.00 5903 122Newt 103a-O ---- 20m no B=20.2 1963 08 11 22.43.00 5919 122Newt 103a-O ---- 30m no B=20.2 1963 08 18 23.03.00 5926 122Newt 103a-O ---- 30m no B=20.4 1963 08 19 23.16.00 5929 122Newt 103a-O ---- 40m no B=19.9 1963 08 22 22.19.00 5941 122Newt 103a-O ---- 30m no B=20.4 1963 08 22 22.47.00 5942 122Newt 103a-O ---- 12m no B=20.2 1963 08 24 00.05.00 5947 122Newt 103a-O ---- 12m no B=20.2 1963 08 24 00.30.00 5948 122Newt 103a-O ---- 30m no B=20.4 1963 08 24 23.12.00 5951 122Newt 103a-O ---- 12m no B=18.4 1963 08 24 23.34.00 5952 122Newt 103a-O ---- 30m no B=20.4 1963 08 25 23.45.00 5954 122Newt 103a-O ---- 20m no B=19.3 1963 08 26 00.05.00 5955 122Newt 103a-O ---- 10m no B=20.4 1963 08 27 02.58.00 5960 122Newt LS 61 ---- 30m no B=20.4 1963 08 29 00.24.00 5966 122Newt 103a-O ---- 12m no B=19.9 1963 08 29 00.47.00 5967 122Newt 103a-O ---- 30m no B=19.8 1963 08 31 02.41.00 5974 122Newt LS 61 ---- 12m no B=18.8 1963 08 31 03.06.00 5975 122Newt LS 61 ---- 28m no B=19.8 1963 09 01 02.12.00 5976 122Newt LS 61 ---- 12m no B=19.8 1963 09 01 02.20.00 5977 122Newt LS 61 ---- 06m no B=15.8 1963 09 14 00.15.00 5980 122Newt 103a-O ---- 35m no B=20.4 1963 09 14 00.41.00 5981 122Newt 103a-O ---- 12m no B=20.4 1963 09 14 19.15.00 5984 122Newt LS 61 ---- 12m no B=18.6 1963 09 14 19.44.00 5985 122Newt 103a-O ---- 35m no B=20.4 1963 09 15 23.53.00 5988 122Newt LS 61 ---- 40m no B=20.4 1963 09 16 00.24.00 5989 122Newt LS 61 ---- 15m no B=20.1 1963 09 16 20.02.00 5992 122Newt 103a-O ---- 12m no B=18.6 1963 09 17 01.51.00 5993 122Newt 103a-O ---- 40m no B=20.2 1963 09 19 00.35.00 5994 122Newt 103a-O ---- 10m no B=17.9 1963 09 19 23.32.00 5995 122Newt 103a-O ---- 15m no B=20.4 1963 09 20 00.05.00 5996 122Newt 103a-O ---- 35m no B=20.1 1963 09 21 22.43.00 5997 122Newt 103a-O ---- 36m no B=19.9 1963 09 21 23.10.00 5998 122Newt 103a-O ---- 13m no B=19.9 1963 09 23 00.44.00 6005 122Newt 103a-O ---- 25m no B=19.9 1963 09 23 22.43.00 6006 122Newt 103a-O ---- 12m no B=20.1 1963 09 23 23.00.00 6007 122Newt 103a-O ---- 35m no B=20.4 1963 09 26 00.07.00 6015 122Newt 103a-O ---- 30m no B=18.3 1963 09 26 22.21.00 6016 122Newt 103a-O ---- 30m no B=19.3 1963 09 26 22.49.00 6017 122Newt 103a-O ---- 12m no B=18.6 1963 10 08 20.45.00 4099 Sc40/50 103a-O ---- 10m no B=17.8 1963 10 10 23.42.00 6031 122Newt LS 61 ---- 20m no B=19.3 1963 10 12 23.30.00 6051 122Newt 103a-O ---- 15m no B=20.1 1963 10 13 23.51.00 6057 122Newt 103a-O ---- 15m no B=20.4 1963 10 16 23.07.00 6066 122Newt 103a-O ---- 30m no B=20.2 1963 10 16 23.36.00 6067 122Newt 103a-O ---- 12m no B=19.9 1963 10 17 22.33.00 6073 122Newt 103a-O ---- 30m no B=20.1 1963 10 19 00.15.00 6085 122Newt 103a-O ---- 30m no B=20.1 1963 10 19 00.39.00 6086 122Newt LS 61 ---- 10m no B=19.3 1963 10 19 01.06.00 6087 122Newt 103a-O ---- 30m no B=19.9 1963 10 20 01.37.00 6092 122Newt 103a-O ---- 30m no B=20.2 1963 10 22 20.24.00 6118 122Newt LS 61 ---- 30m no B=20.1 1963 10 22 20.46.00 6119 122Newt LS 61 ---- 12m no B=20.1 1963 10 23 18.15.00 6121 122Newt LS 61 ---- 20m no B=18.4 1963 10 25 22.55.00 6127 122Newt 103a-O ---- 20m no B=19.3 1963 10 29 02.28.00 6141 122Newt IIa-O ---- 30m no B=18.6 1963 11 08 18.35.00 6144 122Newt IIa-O ---- 15m no B=17.8 1963 11 14 00.30.00 6150 122Newt IIa-O ---- 30m no B=20.1 1963 11 17 17.34.00 6152 122Newt IIa-O ---- 30m no B=19.9 1963 12 09 22.38.00 6192 122Newt 103a-O ---- 20m no B=20.4 1963 12 10 23.57.00 6200 122Newt 103a-O ---- 12m no B=19.3 1963 12 11 00.19.00 6201 122Newt 103a-O ---- 30m no B=19.9 1963 12 12 18.13.00 6205 122Newt 103a-O ---- 30m no B=20.4 1963 12 17 17.28.00 6215 122Newt 103a-O ---- 30m no B=19.9 1963 12 18 19.51.00 6222 122Newt IIa-O ---- 30m no B=20.2 1964 01 03 19.15.00 6227 122Newt 103a-O ---- 20m no B=20.4 1964 01 03 19.55.00 6228 122Newt 103a-O UG1 40m no U=18.4 1964 01 04 18.22.00 6229 122Newt 103a-O ---- 20m no B=20.4 1964 01 05 18.38.00 6232 122Newt 103a-O ---- 20m no B=20.4 1964 01 06 21.46.00 6242 122Newt 103a-O ---- 20m no B=20.2 1964 01 07 17.24.00 6245 122Newt 103a-O ---- 20m no B=20.2 1964 01 08 17.21.00 6248 122Newt 103a-O ---- 12m no B=20.4 1964 01 08 18.20.00 6249 122Newt 103a-O ---- 35m no B=20.4 1964 01 09 18.15.00 6265 122Newt 103a-O ---- 35m no B=20.2 1964 01 18 17.45.00 6256 122Newt 103a-O ---- 15m no B=20.1 1964 01 18 18.12.00 6257 122Newt 103a-O ---- 35m no B=19.9 1964 01 19 17.49.00 6264 122Newt 103a-O ---- 15m no B=19.9 1964 01 20 18.05.00 6273 122Newt 103a-O ---- 15m no B=20.1 1964 01 20 18.33.00 6274 122Newt 103a-O ---- 35m no B=20.4 1964 01 21 18.13.00 6279 122Newt 103a-O ---- 12m no B=20.1 1964 01 21 18.32.00 6280 122Newt 103a-O ---- 25m no B=19.3 1964 02 01 20.06.00 6289 122Newt 103a-O ---- 12m no B=18.3 1964 02 02 19.18.00 6294 122Newt 103a-O ---- 12m no B=18.6 1964 02 02 19.36.00 6295 122Newt 103a-O ---- 20m no B=18.4 1964 02 03 18.34.00 6298 122Newt 103a-O ---- 30m no B=20.1 1964 02 03 18.57.00 6299 122Newt 103a-O ---- 12m no B=20.1 1964 02 04 18.19.00 6302 122Newt 103a-O ---- 25m no B=19.9 1964 02 05 19.15.00 6305 122Newt 103a-O ---- 30m no B=19.9 1964 02 06 18.19.00 6306 122Newt 103a-O ---- 30m no B=20.1 1964 02 06 18.33.00 6307 122Newt 103a-O ---- 12m no B=19.8 1964 02 07 19.07.00 6308 122Newt 103a-O ---- 15m no B=17.8 1964 02 08 18.16.00 6311 122Newt 103a-O ---- 15m no B=19.9 1964 02 08 18.42.00 6312 122Newt 103a-O ---- 35m no B=20.1 1964 02 10 18.05.00 6316 122Newt 103a-O ---- 12m no B=19.8 1964 02 10 18.28.00 6317 122Newt 103a-O ---- 30m no B=20.1 1964 06 07 01.06.00 6406 122Newt LS 61 ---- 12m no B=17.8 1964 06 07 01.29.00 6407 122Newt LS 61 ---- 25m no B=17.9 1964 07 08 01.01.30 6446 122Newt 103a-O ---- 30m no B=20.2 1964 07 12 01.19.00 6458 122Newt 103a-O ---- 30m no B=20.1 1964 07 13 01.16.00 6460 122Newt 103a-O ---- 30m no B=20.2 1964 07 13 01.41.00 6461 122Newt 103a-O ---- 12m no B=20.4 1964 07 14 00.45.00 6463 122Newt 103a-O ---- 25m no B=20.2 1964 07 15 01.08.00 6468 122Newt 103a-O ---- 30m no B=20.2 1964 07 15 01.31.00 6469 122Newt 103a-O ---- 12m no B=19.8 1964 07 16 01.00.00 6471 122Newt 103a-O ---- 20m no B=20.1 1964 07 17 01.29.00 6475 122Newt 103a-O ---- 20m no B=19.3 1964 07 18 01.30.00 6479 122Newt 103a-O ---- 25m no B=19.8 1964 07 18 01.50.00 6480 122Newt 103a-O ---- 12m no B=19.8 1964 08 03 23.28.00 6482 122Cass 103a-O ---- 45m no B=17.9 1964 08 07 02.38.00 6494 122Cass 103a-O ---- 35m no B=18.0 1964 08 08 00.11.00 6497 122Cass 103a-O ---- 06m no B=15.8 1964 08 08 00.47.00 6498 122Cass 103a-O ---- 40m no B=17.8 1964 08 10 02.24.00 6506 122Cass 103a-O ---- 40m no B=18.6 1964 08 11 00.16.00 6511 122Newt 103a-O ---- 15m no B=19.9 1964 08 12 00.26.00 6518 122Newt 103a-O ---- 12m no B=20.4 1964 08 12 00.48.00 6519 122Newt 103a-O ---- 30m no B=20.4 1964 08 13 00.58.00 6526 122Newt 103a-O ---- 15m no B=19.9 1964 08 13 01.33.00 6527 122Newt 103a-O ---- 30m no B=20.1 1964 08 16 23.11.00 6529 122Newt 103a-O ---- 20m no B=20.4 1964 09 02 22.02.00 6532 122Newt 103a-O ---- 12m no B=20.4 1964 09 04 01.05.00 6539 122Newt 103a-O ---- 30m no B=20.2 1964 09 04 01.27.00 6540 122Newt 103a-O ---- 12m no B=19.9 1964 09 04 23.34.00 6546 122Newt 103a-O ---- 30m no B=20.2 1964 09 04 23.58.00 6547 122Newt 103a-O ---- 12m no B=20.2 1964 09 06 23.34.00 6551 122Newt 103a-O ---- 30m no B=20.4 1964 09 06 23.58.00 6552 122Newt 103a-O ---- 12m no B=20.4 1964 09 07 22.24.00 6557 122Newt 103a-O ---- 30m no B=19.9 1964 09 07 22.46.00 6558 122Newt 103a-O ---- 12m no B=19.8 1964 09 08 20.53.00 6560 122Newt 103a-O ---- 20m no B=19.3 1964 09 15 23.20.00 6565 122Newt 103a-O ---- 30m no B=20.2 1964 09 15 23.42.00 6566 122Newt 103a-O ---- 12m no B=19.8 1964 10 06 18.41.00 6604 122Newt 103a-O ---- 12m no B=19.9 1964 10 06 19.02.00 6605 122Newt 103a-O ---- 30m no B=20.4 1964 10 14 22.14.00 6610 122Newt IIa-O ---- 30m no B=19.9 1964 10 16 00.14.00 6615 122Newt IIa-O ---- 30m no B=20.1 1964 10 17 02.06.00 6621 122Newt IIa-O ---- 20m no B=20.2 1964 11 01 22.56.00 6625 122Cass 103a-O ---- 60m no B=19.8 1964 11 03 23.56.00 6628 122Cass 103a-O ---- 60m no B=19.3 1964 11 05 22.37.00 6633 122Cass 103a-O ---- 60m no B=19.9 1964 11 06 23.02.00 6640 122Cass 103a-O ---- 60m no B=20.4 1964 11 12 17.38.00 6645 122Newt IIa-O ---- 10m no B=20.1 1964 11 12 23.17.00 6646 122Newt IIa-O ---- 15m no B=19.9 1964 11 13 23.31.00 6652 122Newt IIa-O ---- 25m no B=20.1 1964 11 13 23.48.00 6653 122Newt IIa-O ---- 05m no B=18.4 1964 11 16 00.00.00 6655 122Newt IIa-O ---- 15m no B=17.8 1964 11 25 17.28.00 6656 122Newt IIa-O ---- 08m no B=20.2 1964 11 25 17.49.00 6657 122Newt IIa-O ---- 30m no B=19.9 1964 11 26 20.35.00 6664 122Newt IIa-O ---- 08m no B=20.2 1964 11 26 20.55.00 6665 122Newt IIa-O ---- 30m no B=20.4 1964 12 01 20.21.00 6672 122Newt IIa-O ---- 08m no B=19.8 1964 12 01 20.41.00 6673 122Newt IIa-O ---- 30m no B=19.3 1964 12 02 22.01.00 6680 122Newt 103a-O ---- 08m no B=19.9 1964 12 02 22.21.00 6681 122Newt IIa-O ---- 30m no B=20.1 1964 12 03 22.46.00 6687 122Newt IIa-O ---- 30m no B=18.6 1964 12 03 23.08.00 6688 122Newt IIa-O ---- 08m no B=18.6 1964 12 04 23.01.00 6691 122Newt IIa-O ---- 20m no B=18.4 1964 12 05 17.09.00 6695 122Newt IIa-O ---- 08m no B=19.3 1964 12 05 17.30.00 6696 122Newt IIa-O ---- 30m no B=19.8 1964 12 06 22.47.00 6708 122Newt IIa-O ---- 20m no B=19.3 1964 12 07 18.36.00 5056 Sc40/50 103a-O ---- 10m no B=17.8 1964 12 07 23.12.00 6712 122Newt IIa-O ---- 20m no B=20.1 1964 12 08 23.26.00 6716 122Newt IIa-O ---- 20m no B=20.1 1964 12 09 17.07.00 6722 122Newt IIa-O ---- 20m no B=20.1 1964 12 10 17.23.00 6730 122Newt IIa-O ---- 20m no B=20.2 1964 12 12 17.16.00 6743 122Newt IIa-O ---- 20m no B=20.1 1964 12 14 22.32.00 6747 122Newt IIa-O ---- 10m no B=17.9 1964 12 23 20.05.00 6753 122Newt IIa-O ---- 20m no B=20.4 1964 12 24 17.42.00 6762 122Newt IIa-O ---- 20m no B=20.2 1964 12 30 21.49.00 6771 122Newt 103a-O ---- 30m no B=19.9 1964 12 30 22.12.00 6772 122Newt 103a-O ---- 12m no B=19.8 1964 12 31 19.27.00 6784 122Newt IIa-O ---- 25m no B=20.4 1965 01 04 18.42.00 6787 122Newt 103a-O ---- 30m no B=19.9 1965 01 04 19.38.00 6788 122Newt 103a-O ---- 30m no B=19.3 1965 01 04 20.01.00 6789 122Newt 103a-O ---- 12m no B=19.3 1965 01 06 18.26.00 6802 122Newt IIa-O ---- 30m no B=20.2 1965 01 06 19.26.00 6803 122Newt 103a-O UG2 40m no U=18.6 1965 01 08 18.12.00 6813 122Newt 103a-O UG2 45m no U=19.8 1965 01 08 18.47.00 6814 122Newt 103a-O ---- 12m no B=20.2 1965 01 10 20.13.00 6827 122Newt 103a-O UG2 45m no U=18.4 1965 01 11 17.52.00 6835 122Newt 103a-O UG2 30m no U=17.9 1965 02 02 18.25.00 6839 122Newt IIa-O ---- 30m no B=19.8 1965 02 02 18.56.00 6840 122Newt IIa-O ---- 30m no B=18.6 1965 02 02 19.35.00 6841 122Newt 103a-O UG2 40m no U=17.8 1965 02 04 22.03.00 6851 122Newt 103a-O ---- 20m no B=18.4 1965 02 11 18.49.00 6865 122Cass 103a-O ---- 35m no B=17.8 1965 06 28 00.54.00 7065 122Newt 103a-O ---- 30m no B=19.9 1965 06 28 01.20.00 7066 122Newt 103a-O ---- 10m no B=20.4 1965 06 30 01.28.00 7072 122Newt 103a-O ---- 28m no B=19.3 1965 06 30 01.48.00 7073 122Newt 103a-O ---- 08m no B=17.8 1965 07 06 01.35.00 7083 122Newt 103a-O UG1 30m no U=17.8 1965 07 26 01.29.00 7088 122Newt 103a-O ---- 15m no B=19.9 1965 07 26 01.52.00 7089 122Newt 103a-O UG1 26m no U=18.4 1965 07 27 00.39.00 7092 122Newt 103a-O ---- 20m no B=17.8 1965 08 07 02.28.00 7101 122Newt 103a-O ---- 18m no B=20.1 1965 08 28 02.44.00 7113 122Newt 103a-O ---- 30m no B=19.9 1965 09 05 00.36.00 7118 122Newt 103a-O ---- 20m no B=19.9 1965 09 05 01.05.00 7119 122Newt 103a-O UG1 30m no U=18.4 1965 09 23 00.10.00 7134 122Newt 103a-O ---- 20m no B=20.1 1965 09 23 00.46.00 7135 122Newt 103a-O UG1 30m no U=18.4 1965 09 24 00.00.00 7138 122Newt 103a-O ---- 20m no B=20.1 1965 09 27 00.37.00 7150 122Newt 103a-O ---- 20m no B=20.2 1965 09 27 01.05.00 7151 122Newt 103a-O UG1 30m no U=17.8 1965 10 02 00.12.00 2 Sc67/92 103a-O ---- 31m no B=18.2 1965 10 02 23.17.00 7157 122Newt 103a-O ---- 20m no B=19.9 1965 10 02 23.46.00 7158 122Newt 103a-O UG1 30m no U=17.8 1965 10 18 18.44.00 5573 Sc40/50 PanRoy ---- 20m no V=16.5 1965 10 20 22.21.00 7195 122Newt 103a-O ---- 20m no B=20.4 1965 10 22 19.42.00 7206 122Newt 103a-O ---- 20m no B=18.0 1965 10 22 20.16.00 7207 122Newt 103a-O UG1 30m no U=17.8 1965 10 23 22.05.00 7210 122Newt 103a-O ---- 20m no B=20.4 1965 10 23 22.37.00 7211 122Newt 103a-O UG1 30m no U=18.4 1965 10 24 18.32.00 7218 122Newt 103a-O ---- 20m no B=20.1 1965 10 24 19.00.00 7219 122Newt 103a-O UG1 30m no U=19.3 1965 10 25 18.15.00 7230 122Newt 103a-O ---- 20m no B=19.8 1965 10 25 18.44.00 7231 122Newt 103a-O UG1 30m no U=17.8 1965 10 27 00.56.00 7254 122Newt 103a-O ---- 25m no B=20.1 1965 10 28 02.00.00 7278 122Newt LS 61 ---- 20m no B=18.4 1965 10 28 02.28.00 7279 122Newt LS 61 UG1 30m no U=17.8 1965 10 31 01.30.00 7311 122Newt 103a-O ---- 30m no B=20.1 1965 11 25 00.15.00 7324 122Newt IIa-O ---- 30m no B=18.8 1965 11 28 22.35.00 7335 122Newt IIa-O ---- 30m no B=20.1 1965 11 31 00.50.00 7343 122Newt IIa-O ---- 30m no B=18.2 1965 12 22 22.05.00 7349 122Newt 103a-O ---- 30m no B=19.3 1965 12 26 19.31.00 7357 122Newt 103a-O ---- 20m no B=19.9 1966 01 18 19.10.00 7369 122Newt 103a-O ---- 30m no B=17.8 1966 01 18 19.34.00 7370 122Newt 103a-O ---- 15m no B=19.8 1966 01 20 19.15.00 7384 122Newt 103a-O ---- 30m no B=20.1 1966 01 20 19.38.00 7385 122Newt 103a-O ---- 15m no B=19.9 1966 01 23 22.35.00 7391 122Newt 103a-O GG13 25m no B=18.2 1966 01 24 17.40.00 7397 122Newt 103a-O ---- 15m no B=19.8 1966 01 24 18.07.00 7398 122Newt 103a-O UG1 30m no U=18.6 1966 07 16 01.13.00 7611 122Newt 103a-O ---- 20m no B=19.9 1966 07 16 22.22.00 7618 122Newt 103a-O ---- 20m no B=19.8 1966 07 20 00.11.00 7624 122Newt 103a-O ---- 30m no B=19.3 1966 08 11 23.20.00 7646 122Newt 103a-O ---- 30m no B=20.2 1966 08 13 00.35.00 7658 122Newt 103a-O GG13 30m no B=20.2 1966 08 13 01.15.00 7659 122Newt 103a-D GG14 30m no V=18.6 1966 08 13 01.47.00 7660 122Newt 103a-O UG1 30m no U=19.8 1966 08 13 02.32.00 7661 122Newt 103a-O UG1 30m no U=19.3 1966 08 13 23.03.00 7676 122Newt 103a-O ---- 30m no B=20.2 1966 08 14 02.25.00 7677 122Newt 103a-O ---- 12m no B=19.9 1966 08 15 01.38.00 7682 122Newt 103a-O ---- 30m no B=20.4 1966 08 15 02.12.00 7683 122Newt 103a-O UG1 30m no B=18.4 1966 08 20 22.32.00 7687 122Newt 103a-O ---- 30m no B=19.9 1966 08 22 23.31.00 7689 122Newt 103a-O ---- 30m no B=19.9 1966 08 22 23.45.00 7690 122Newt 103a-O ---- 07m no B=17.2 1966 08 31 23.25.30 7693 122Cass 103a-O ---- 15m no B=17.8 1966 09 06 23.36.00 7696 122Cass 103a-O ---- 30m no B=19.3 1966 09 07 22.23.00 7702 122Cass 103a-O ---- 20m no B=19.3 1966 09 10 00.08.00 7714 122Newt 103a-O ---- 30m no B=19.9 1966 09 10 01.29.00 7715 122Newt 103a-O ---- 10m no B=19.3 1966 09 11 22.56.00 7722 122Newt 103a-O ---- 30m no B=18.8 1966 09 12 23.34.00 7728 122Newt 103a-O ---- 30m no B=20.1 1966 09 13 21.58.00 7730 122Newt 103a-O ---- 30m no B=19.8 1966 09 14 00.38.00 7735 122Newt 103a-O ---- 30m no B=19.9 1966 09 15 00.11.00 7736 122Newt 103a-O ---- 30m no B=19.3 1966 09 20 22.05.00 7750 122Newt 103a-O ---- 30m no B=19.8 1966 09 20 22.25.00 7751 122Newt 103a-O ---- 10m no B=19.3 1966 09 21 21.45.00 7765 122Newt 103a-O ---- 30m no B=19.8 1966 09 21 22.06.00 7766 122Newt 103a-O ---- 10m no B=19.9 1966 09 25 00.31.00 7782 122Cass 103a-O ---- 30m no B=17.8 1966 10 06 22.13.00 7789 122Cass 103a-O ---- 30m no B=19.8 1966 10 13 00.02.00 7799 122Cass 103a-O ---- 30m no B=17.8 1966 10 13 19.24.00 7800 122Cass IIIa-J ---- 60m no B=15.8 1966 10 14 23.04.00 7809 122Cass 103a-O ---- 30m no B=18.8 1966 10 21 23.17.00 7821 122Cass 103a-O ---- 30m no B=19.3 1966 11 07 21.11.00 7833 122Cass 103a-O ---- 40m no B=19.0 1966 11 08 19.17.00 7838 122Cass 103a-O ---- 38m no B=19.0 1966 11 14 01.00.00 7846 122Newt 103a-O ---- 30m no B=19.0 1966 11 14 01.25.00 7847 122Newt 103a-O ---- 10m no B=19.9 1966 11 15 18.07.00 7850 122Newt 103a-O ---- 30m no B=20.1 1966 11 15 18.30.00 7851 122Newt 103a-O ---- 10m no B=19.9 1966 11 17 19.30.00 7855 122Newt 103a-O ---- 10m no B=20.1 1966 12 03 20.41.00 7884 122Cass 103a-O ---- 40m no B=20.1 1966 12 06 21.59.00 7889 122Cass 103a-O ---- 30m no B=20.1 1966 12 08 20.27.00 7893 122Cass 103a-O ---- 40m no B=20.1 1966 12 09 17.33.00 7894 122Newt 103a-O ---- 30m no B=20.1 1966 12 11 17.08.30 7903 122Newt 103a-O ---- 15m no B=19.9 1966 12 15 21.44.00 7914 122Cass 103a-O ---- 40m no B=19.6 1966 12 31 17.52.30 7929 122Cass 103a-O ---- 25m no B=17.8 1967 01 01 18.54.00 511 Sc67/92 IIIa-Jarr ---- 60m no B=16.7 1967 01 04 18.58.00 7933 122Cass 103a-O ---- 30m no B=19.0 1967 01 09 18.15.00 7936 122Newt 103a-O ---- 20m no B=19.9 1967 01 11 17.58.00 7937 122Newt 103a-O ---- 30m no B=19.3 1967 01 11 18.19.00 7938 122Newt 103a-O ---- 10m no B=19.3 1967 01 13 17.37.00 7940 122Newt 103a-O ---- 20m no B=20.1 1967 01 29 17.59.00 7949 122Newt 103a-O ---- 30m no B=19.0 1967 02 06 18.22.00 7950 122Newt 103a-O ---- 15m no B=19.8 1967 02 11 18.57.00 7967 122Newt 103a-O ---- 20m no B=19.0 1967 02 11 19.20.00 7968 122Newt 103a-O ---- 08m no B=17.8 1967 08 11 00.19.30 8114 122Newt 103a-O ---- 05m no B=20.4 1967 09 07 01.31.00 8127 122Cass IIa-O ---- 26m no B=18.4 1967 09 25 20.16.00 863 Sc67/92 103a-O ---- 15m no B=19.8 1967 09 27 19.56.00 8128 122Newt 103a-O ---- 20m no B=20.4 1967 09 28 20.40.00 8132 122Newt 103a-O ---- 20m no B=20.4 1967 09 28 20.55.00 8133 122Newt 103a-O ---- 08m no B=20.1 1967 09 30 22.04.00 8150 122Newt 103a-O ---- 30m no B=19.8 1967 09 30 22.26.00 8151 122Newt 103a-O ---- 10m no B=19.6 1967 10 01 20.20.00 8152 122Newt 103a-O ---- 10m no B=19.3 1967 10 03 20.40.00 8162 122Newt 103a-O ---- 12m no B=20.1 1967 10 05 22.33.00 8178 122Newt 103a-O ---- 12m no B=19.9 1967 10 08 19.53.00 8181 122Newt 103a-O ---- 20m no B=19.6 1967 10 25 19.15 00 8196 122Cass 103a-O ---- 25m no B=19.8 1967 12 01 17.28.00 8201 122Newt 103a-O ---- 10m no B=20.1 1967 12 01 17.53.00 8202 122Newt 103a-O ---- 30m no B=20.4 1967 12 20 17.22.00 8224 122Cass 103a-O ---- 30m no B=18.9 1967 12 27 17.56.00 8225 122Newt 103a-O ---- 10m no B=20.4 1967 12 27 18.13.00 8226 122Newt 103a-O ---- 20m no B=20.6 1967 12 28 17.36.00 8234 122Newt 103a-O ---- 10m no B=20.4 1967 12 31 17.10.00 8237 122Newt 103a-O ---- 13m no B=18.2 1967 12 31 17.30.00 8238 122Newt 103a-O ---- 20m no B=18.3 1968 01 01 17.42.00 8239 122Newt 103a-O ---- 10m no B=20.1 1968 01 01 18.04.00 8240 122Newt IIa-O ---- 20m no B=19.9 1968 01 02 17.51.00 8242 122Newt IIa-O ---- 10m no B=19.0 1968 01 02 18.10.05 8243 122Newt 103a-O GG13 20m no B=20.1 1968 01 04 17.15.00 8254 122Newt IIa-O ---- 10m no B=19.0 1968 01 04 17.45.00 8255 122Newt 103a-O GG13 20m no B=19.3 1968 01 04 18.13.00 8256 122Newt 103a-O UG2 30m no U=17.8 1968 01 20 17.58.00 8264 122Cass 103a-O ---- 30m no B=18.9 1968 01 21 18.55.00 8265 122Cass 103a-O ---- 30m no B=18.9 1968 01 23 18.40.00 8267 122Cass 103a-O ---- 30m no B=18.9 1968 01 25 19.46.00 8268 122Cass 103a-O ---- 30m no B=17.2 1968 01 30 17.50.00 8269 122Cass 103a-O ---- 30m no B=18.9 1968 02 18 18.29.00 8271 122Cass 103a-O ---- 30m no B=17.8 1968 02 25 18.30.00 8275 122Newt 103a-O ---- 08m no B=18.6 1968 07 26 00.08.00 8367 122Newt 103a-O ---- 20m no B=20.4 1968 08 22 02.58.00 8377 122Newt 103a-O ---- 30m no B=20.1 1968 08 24 01.31.00 8384 122Newt 103a-O ---- 20m no B=19.6 1968 09 19 22.20.00 8395 122Newt 103a-O ---- 20m no B=19.6 1968 09 24 23.48.00 8405 122Newt 103a-O ---- 30m no B=19.6 1968 09 25 20.00.00 8406 122Newt 103a-O ---- 27m no B=20.4 1968 09 27 21.22.00 8409 122Newt 103a-O ---- 30m no B=19.9 1968 10 20 23.25.00 8416 122Cass 103a-O ---- 30m no B=18.5 1968 10 22 19.17.00 8417 122Cass 103a-O ---- 30m no B=19.0 1968 10 23 20.22.00 1899 Sc67/92 103a-O GG13 20m no B=18.4 1968 10 24 22.39.00 8436 122Newt 103a-O ---- 20m no B=20.4 1968 10 26 21.24 00 8442 122Newt 103a-O ---- 06m no B=16.6 1968 10 27 18.00.00 8443 122Newt 103a-O ---- 20m no B=19.6 1968 10 28 20.47.00 8460 122Newt 103a-O ---- 20m no B=19.6 1968 10 29 23.17.00 1948 Sc67/92 103a-O GG13 30m no B=18.4 1968 11 20 17.30.00 8469 122Newt 103a-O ---- 20m no B=20.1 1968 11 20.20.58.00 8462 122Newt 103a-O ---- 20m no B=20.2 1968 11 23 19.12.00 1960 Sc67/92 103a-O GG13 30m no B=19.3 1968 11 24 18.30.00 8470 122Newt 103a-O ---- 20m no B=19.6 1968 11 25 17.26.00 8472 122Newt 103a-O ---- 20m no B=20.2 1968 11 25 22.39.00 1984 Sc67/92 103a-O GG13 30m no B=18.6 1968 11 27 23.38.00 2000 Sc67/92 103a-O GG13 30m no B=18.2 1968 12 10 18.49.00 2021 Sc67/92 103a-O GG13 30m no B=18.3 1968 12 17 20.15.00 2042 Sc67/92 103a-O GG13 30m no B=18.0 1968 12 18 20.08.00 8482 122Newt 103a-O ---- 20m no B=19.3 1968 12 19 19.48.00 2058 Sc67/92 103a-O GG13 30m no B=17.8 1968 12 19 20.31.00 8487 122Newt 103a-O ---- 20m no B=20.1 1968 12 20 18.56.00 8489 122Newt 103a-O ---- 20m no B=19.6 1968 12 23 19.28.00 2088 Sc67/92 103a-O ---- 30m no B=17.8 1969 01 06 17.47.00 2102 Sc67/92 103a-O GG13 30m no B=18.4 1969 01 06 17.50.00 8494 122Cass 103a-O ---- 40m no B=19.6 1969 01 06 18.26.00 8495 122Cass 103a-O ---- 20m no B=18.4 1969 01 10 17.32.00 2107 Sc67/92 103a-O GG13 30m no B=17.8 1969 01 19 17.44.00 2122 Sc67/92 103a-O GG13 30m no B=18.0 1969 01 20 18.34.00 8507 122Newt 103a-O ---- 40m no B=18.4 1969 01 20 19.08.00 8508 122Newt 103a-O ---- 15m no B=19.0 1969 01 21 17.55.00 2151 Sc67/92 103a-O GG13 30m no B=17.8 1969 02 13 18.30.00 2217 Sc67/92 103a-O GG13 30m no B=17.8 1969 07 13 01.20.00 8568 122Newt 103a-O ---- 20m no B=19.6 1969 07 26 00.35.00 8577 122Cass 103a-O ---- 40m no B=16.5 1969 08 14 23.44.00 8582 122Newt 103a-O GG13 30m no B=18.8 1969 09 04 22.13.00 2494 Sc67/92 103a-O GG13 30m no B=18.0 1969 09 10 23.06.00 8586 122Cass 103a-O ---- 30m no B=17.0 1969 09 10 23.53.00 2504 Sc67/92 103a-O GG13 30m no B=18.0 1969 09 13 22.48.00 2513 Sc67/92 103a-O GG13 40m no B=18.2 1969 09 15 22.40.00 2519 Sc67/92 Ia-O ---- 25m no B=17.8 1969 09 15 22.40.00 8587 122Cass Ia-O ---- 40m no B=19.6 1969 09 18 01.42.00 8588 122Cass Ia-O ---- 38m no B=19.3 1969 09 18 21.33.00 8589 122Cass Ia-O ---- 25m no B=17.8 1969 09 19 22.11.00 2530 Sc67/92 103a-O GG13 20m no B=19.8 1969 09 19 22.31.00 8590 122Cass Ia-O ---- 20m no B=17.2 1969 09 20 23.04.00 2531 Sc67/92 103a-O ---- 25m no B=18.2 1969 09 21 00.04.00 8591 122Cass Ia-O ---- 30m no B=18.9 1969 09 23 00.49.00 8592 122Cass Ia-O ---- 30m no B=19.6 1969 10 04 20.59.00 2557 Sc67/92 103a-O ---- 25m no B=18.0 1969 10 05 21.18.00 2567 Sc67/92 103a-O GG13 40m no B=18.2 1969 10 05 23.04.00 8594 122Cass Ia-O ---- 60m no B=19.3 1969 10 06 23.21.00 2574 Sc67/92 103a-O ---- 30m no B=18.6 1969 10 08 22.59.00 8595 122Cass Ia-O ---- 40m no B=19.3 1969 10 09 21.38.00 2596 Sc67/92 103a-O ---- 30m no B=18.4 1969 10 10 03.33.00 8596 122Newt 103a-O ---- 20m no B=19.0 1969 10 10 20.21.00 8599 122Newt 103a-O ---- 20m no B=19.3 1969 10 12 20.52.00 8611 122Newt 103a-O ---- 30m no B=20.4 1969 10 12 21.18.00 8612 122Newt 103a-O ---- 10m no B=20.1 1969 10 12 22.14.00 2631 Sc67/92 103a-O ---- 30m no B=18.2 1969 10 13 19.40.00 8614 122Newt 103a-O ---- 20m no B=20.2 1969 10 14 20.06.00 8620 122Newt IIa-O ---- 30m no B=19.9 1969 10 16 20.53.00 8621 122Cass Ia-O ---- 45m no B=19.8 1969 10 16 21.38.00 2680 Sc67/92 103a-O GG13 30m no B=19.3 1969 10 18 21.59.00 2695 Sc67/92 103a-O ---- 30m no B=18.0 1969 10 18 23.17.00 8622 122Cass Ia-O ---- 40m no B=19.9 1969 10 20 22.00.00 8623 122Cass Ia-O ---- 40m no B=19.3 1969 10 29 18.30.00 2721 Sc67/92 103a-O ---- 25m no B=17.8 1969 10 31 19.19.00 8624 122Cass Ia-O ---- 60m no B=19.3 1969 11 01 20.25.00 2731 Sc67/92 103a-O ---- 25m no B=18.4 1969 11 03 20.50.00 2754 Sc67/92 103a-O ---- 25m no B=18.4 1969 11 03 22.50.00 8625 122Cass Ia-O ---- 40m no B=20.1 1969 11 05 19.17.00 8626 122Newt IIa-O ---- 30m no B=20.4 1969 11 05 21.40.00 2764 Sc67/92 103a-O ---- 25m no B=17.8 1969 11 15 21.42.00 2777 Sc67/92 103a-O ---- 25m no B=18.2 1969 11 15 22.10.00 8630 122Cass Ia-O ---- 40m no B=18.6 1969 11 16 23.07.00 2792 Sc67/92 103a-O ---- 25m no B=18.0 1969 11 27 18.20.00 2803 Sc67/92 103a-O ---- 20m no B=17.8 1969 11 30 18.04.00 2817 Sc67/92 103a-O ---- 25m no B=18.2 1969 12 01 19.00.00 8635 122Cass Ia-O ---- 15m no B=19.8 1969 12 01 19.30.00 8636 122Cass Ia-O ---- 40m no B=19.8 1969 12 02 19.16.00 2839 Sc67/92 103a-O ---- 25m no B=18.4 1969 12 06 20.58.00 2858 Sc67/92 IIIa-Jarr ---- 60m no B=17.8 1969 12 07 18.19.00 8640 122Newt 103a-O ---- 20m no B=20.1 1969 12 08 18.02.00 2884 Sc67/92 103a-O ---- 25m no B=18.4 1969 12 11 19.32.00 2904 Sc67/92 103a-O ---- 25m no B=18.6 1969 12 16 19.16.00 8660 122Cass Ia-O ---- 25m no B=18.6 1969 12 26 18.20.00 2948 Sc67/92 103a-O ---- 25m -- ------ 1969 12 26 18.23.00 8661 122Cass Ia-O ---- 40m no B=19.9 1969 12 29 20.47.00 8662 122Cass Ia-O ---- 40m no B=18.8 1970 01 02 17.28.00 8663 122Cass Ia-O ---- 40m no B=19.3 1970 01 02 19.05.00 2976 Sc67/92 103a-O ---- 20m no B=18.6 1970 01 03 17.25.00 8664 122Cass Ia-O ---- 40m no B=19.3 1970 01 07 21.04.00 8665 122Newt 103a-O ---- 20m no B=19.3 1970 02 06 20.31.00 8671 122Newt 103a-O ---- 20m no B=19.3 1970 02 26 18.40.00 8698 122Cass Ia-O ---- 40m no B=17.2 1970 02 28 19.35.00 8700 122Cass Ia-O ---- 30m no B=16.6 1970 07 06 01.05.00 8724 122Newt 103a-O ---- 30m no B=18.3 1970 07 06 01.27.00 8725 122Newt 103a-O ---- 10m no B=18.1 1970 07 09 01.32.00 3457 Sc67/92 103a-O ---- 20m no B=18.4 1970 07 10 01.05.00 8730 122Newt 103a-O ---- 25m no B=19.8 1970 07 29 00.25.00 3492 Sc67/92 103a-O GG13 30m no B=19.3 1970 07 30 00.12.00 8733 122Newt 103a-O ---- 25m no B=17.8 1970 08 01 00.23.00 8734 122Newt 103a-O ---- 30m no B=20.1 1970 08 01 00.44.00 8735 122Newt 103a-O ---- 10m no B=19.3 1970 08 01 00.52.00 3504 Sc67/92 103a-O GG13 30m no B=18.6 1970 08 05 00.36.00 3539 Sc67/92 103a-O GG13 30m no B=18.8 1970 08 06 01.14.00 3552 Sc67/92 103a-O GG13 30m no B=18.4 1970 08 12 00.31.00 3575 Sc67/92 103a-O GG13 30m no B=19.8 1970 08 19 01.10.00 8738 122Cass Ia-O ---- 40m no B=15.8 1970 08 25 01.40.00 8739 122Cass 103a-O ---- 40m no B=17.2 1970 09 06 23.46.00 3619 Sc67/92 103a-O GG13 30m no B=19.9 1970 09 07 00.16.00 8743 122Newt 103a-O ---- 30m no B=20.1 1970 09 07 00.32.00 3620 Sc67/92 103a-O UG2 40m no U=18.1 1970 09 20 19.18.00 3631 Sc67/92 103a-O GG13 30m no B=18.4 1970 09 20 19.55.00 3638 Sc67/92 INsens RG5 30m no I=15.6 1970 09 24 22.26.00 3636 Sc67/92 103a-O GG13 30m no B=18.6 1970 09 24 23.15.00 3637 Sc67/92 103a-O UG2 40m no U=17.2 1970 09 29 23.02.00 3655 Sc67/92 103a-O GG13 10m no B=18.4 1970 10 01 19.14.00 8745 122Cass Ia-O ---- 40m no B=17.8 1970 10 01 21.04.00 3667 Sc67/92 103a-O ---- 20m no B=18.8 1970 10 03 19.15.00 8746 122Newt 103a-O ---- 40m no B=20.1 1970 10 03 19.41.00 8747 122Newt 103a-O ---- 10m no B=17.8 1970 10 03 22.49.00 3683 Sc67/92 Ia-O ---- 20m no B=17.9 1970 10 04 23.24.00 3696 Sc67/92 103a-O GG13 30m -- ------ 1970 10 04 23.26.00 8748 122Newt 103a-O ---- 30m no B=19.9 1970 10 04 23.49.00 8749 122Newt 103a-O ---- 10m no B=19.8 1970 10 05 22.50.00 8750 122Newt 103a-O ---- 30m no B=20.4 1970 10 05 23.11.00 8751 122Newt 103a-O ---- 10m no B=20.2 1970 10 06 00.18.00 3707 Sc67/92 103a-O GG13 30m no B=19.9 1970 10 10 00.22.00 8753 122Cass Ia-O ---- 40m no B=17.8 1970 10 10 00.47.00 3722 Sc67/92 103a-O ---- 20m no B=19.9 1970 10 19 18.26.00 8754 122Cass Ia-O ---- 40m no B=17.8 1970 10 19 18.52.00 3740 Sc67/92 103a-O ---- 20m no B=19.8 1970 10 21 18.20.00 8755 122Cass Ia-O ---- 55m no B=18.6 1970 10 21 20.02.00 3748 Sc67/92 103a-O GG13 30m no B=20.2 1970 10 22 21.51.00 3756 Sc67/92 103a-O ---- 25m no B=19.8 1970 10 24 21.19.00 3765 Sc67/92 103a-O GG13 30m no B=19.8 1970 10 25 21.15.00 3780 Sc67/92 103a-O GG13 30m no B=18.6 1970 10 26 00.00.00 8756 122Cass Ia-O ---- 60m no B=18.4 1970 10 26 21.35.00 3793 Sc67/92 103a-O GG13 30m no B=19.8 1970 10 27 23.49.00 3815 Sc67/92 103a-O GG13 30m no B=18.6 1970 10 28 22.08.00 3824 Sc67/92 103a-O GG13 30m no B=18.4 1970 10 28 22.45.00 8757 122Newt 103a-O ---- 40m no B=20.1 1970 10 28 23.15.00 8758 122Newt 103a-O ---- 15m no B=20.2 1970 10 29 23.10.00 3841 Sc67/92 103a-O GG13 30m no B=18.4 1970 11 01 23.03.00 3850 Sc67/92 103a-O GG13 30m no B=18.2 1970 11 02 00.14.00 8764 122Newt 103a-O ---- 30m no B=18.6 1970 11 02 00.43.00 8765 122Newt 103a-O ---- 15m no B=18.4 1970 11 04 23.35.00 3863 Sc67/92 Ia-O GG13 30m no B=17.8 1970 11 22 21.34.00 3878 Sc67/92 103a-O GG13 30m no B=17.8 1970 11 22 22.04.00 3879 Sc67/92 103a-D GG14 20m no V=17.8 1970 11 23 21.01.00 3890 Sc67/92 103a-D GG14 20m no V=18.6 1970 11 23 21.33.00 3891 Sc67/92 103a-O GG13 30m no B=18.4 1970 11 24 21.04.00 3907 Sc67/92 103a-D GG14 20m no V=19.2 1970 11 24 21.23.00 8766 122Cass 103a-O ---- 60m no B=18.8 1970 11 24 21.33.00 3908 Sc67/92 103a-O GG13 30m no B=18.8 1970 11 25 21.18.00 3924 Sc67/92 103a-O GG13 30m no B=18.4 1970 11 25 21.50.00 3925 Sc67/92 103a-D GG14 20m no V=18.0 1970 11 27 21.28.00 3957 Sc67/92 103a-D GG14 20m no V=19.2 1970 11 29 22.48.00 8767 122Cass 103a-O ---- 60m no B=18.4 1970 11 30 20.45.00 3982 Sc67/92 103a-O GG13 30m no B=18.8 1970 12 01 22.28.00 3994 Sc67/92 103a-O GG13 30m no B=18.6 1970 12 03 21.58.00 4023 Sc67/92 103a-O GG13 30m no B=18.4 1970 12 05 23.11.00 4034 Sc67/92 103a-O GG13 30m no B=18.4 1970 12 15 17.47.00 8768 122Cass Ia-O ---- 60m no B=17.8 1970 12 15 17.59.00 4051 Sc67/92 103a-O GG13 30m no B=17.2 1970 12 16 17.50.00 8770 122Cass Ia-O ---- 60m no B=19.3 1970 12 17 17.51.00 4058 Sc67/92 IIa-O GG13 30m no B=18.8 1970 12 18 18.14.00 8772 122Cass Ia-O ---- 60m no B=17.8 1970 12 19 18.26.00 4072 Sc67/92 IIa-O GG13 40m no B=18.4 1970 12 19 18.33.00 8774 122Cass Ia-O ---- 60m no B=18.6 1970 12 20 20.33.00 4088 Sc67/92 IIa-O GG13 40m no B=18.2 1970 12 21 18.53.00 8775 122Cass Ia-O ---- 10m no B=17.2 1970 12 21 19.38.00 8776 122Cass Ia-O ---- 60m no B=19.3 1970 12 21 20.22.00 4098 Sc67/92 IIa-O GG13 40m no B=17.9 1970 12 22 19.23.00 4104 Sc67/92 IIa-O GG13 40m no B=17.8 1970 12 24 18.35.00 8777 122Newt 103a-O ---- 40m no B=19.9 1970 12 24 19.04.00 8778 122Newt 103a-O ---- 12m no B=19.8 1970 12 24 19.13.00 4116 Sc67/92 IIa-O GG13 40m no B=17.8 1970 12 25 17.42.00 8779 122Newt 103a-O ---- 30m no B=19.9 1970 12 25 18.06.00 8780 122Newt 103a-O ---- 12m no B=18.6 1970 12 30 19.16.00 4131 Sc67/92 IIa-O GG13 40m no B=18.1 1970 12 30 19.43.00 8785 122Newt 103a-O ---- 12m no B=19.9 1970 12 30 20.20.00 8786 122Newt 103a-O ---- 30m no B=19.8 1971 01 03 22.52.00 8787 122Newt 103a-O ---- 30m no B=17.8 1971 01 26 17.46.00 8788 122Newt 103a-O ---- 28m no B=18.1 1971 01 26 21.18.00 4158 Sc67/92 103a-O GG13 17m no B=17.8 1971 01 27 19.48.00 4164 Sc67/92 103a-O ---- 20m no B=17.9 1971 01 28 18.24.00 8794 122Newt 103a-O ---- 14m no B=19.8 1971 01 28 19.59.00 4180 Sc67/92 103a-O GG13 30m no B=18.2 1971 02 02 17.57.00 8812 122Newt 103a-O ---- 15m no B=17.8 1971 02 12 18.39.00 4201 Sc67/92 103a-O GG13 30m no B=17.8 1971 02 19 19.01.00 4204 Sc67/92 103a-O GG13 30m no B=17.8 1971 02 21 19.44.00 4225 Sc67/92 103a-O ---- 20m no B=17.8 1971 02 24 18.30.00 8850 122Newt 103a-O ---- 20m no B=18.1 1971 07 01 00 24 00 4459 Sc67/92 103a-O ---- 20m no B=17.8 1971 07 02 01.00.00 4467 Sc67/92 103a-O ---- 20m no B=17.8 1971 07 04 01.19.00 4476 Sc67/92 103a-O GG13 25m no B=18.0 1971 07 30 01.17.00 4518 Sc67/92 103a-O GG13 25m no B=18.6 1971 08 14 23.11.00 4565 Sc67/92 103a-O GG13 20m no B=18.0 1971 08 15 00.33.00 4567 Sc67/92 INsens RG5 30m no I=16.1 1971 08 15 20.55.00 4570 Sc67/92 103a-O GG13 25m no B=17.8 1971 08 16 01.48.00 8874 122Cass 103a-O ---- 40m no B=16.6 1971 08 16 23.33.00 8876 122Newt 103a-O ---- 20m no B=18.8 1971 08 18 23.03.00 8883 122Newt 103a-O ---- 30m no B=19.9 1971 08 18 23.24.00 8884 122Newt 103a-O ---- 10m no B=18.4 1971 08 19 01.23.00 4600 Sc67/92 103a-O GG13 30m no B=18.2 1971 08 19 23.45.00 8887 122Newt 103a-O ---- 30m no B=19.3 1971 08 21 23.47.00 8889 122Newt 103a-O ---- 30m no B=19.9 1971 09 14 21.15.00 4624 Sc67/92 103a-O GG13 30m no B=18.6 1971 09 18 01.35.00 4637 Sc67/92 103a-O GG13 40m no B=17.8 1971 09 19 00.45.00 8897 122Cass 103a-O ---- 60m no B=17.8 1971 09 22 23.07.00 4681 Sc67/92 103a-O GG13 30m no B=17.8 1971 10 01 00.59.00 4686 Sc67/92 103a-O GG13 30m no B=17.8 1971 10 10 20.18.00 4703 Sc67/92 103a-O GG13 30m no B=17.8 1971 10 17 22.14.00 4752 Sc67/92 103a-O GG13 30m no B=17.8 1971 10 19 21.45.00 4780 Sc67/92 103a-O GG13 30m no B=18.6 1971 10 21 21.27.00 4812 Sc67/92 103a-O GG13 30m no B=18.6 1971 10 23 01.36.00 8904 122Newt 103a-O GG13 30m no B=18.3 1971 10 24 22.18.00 4846 Sc67/92 103a-O GG13 30m no B=18.4 1971 11 07 19.04.00 4904 Sc67/92 103a-O GG13 26m no B=18.2 1971 11 15 20.04.00 4912 Sc67/92 103a-O GG13 30m no B=18.0 1971 11 20 21.15.00 4958 Sc67/92 103a-O GG13 30m no B=17.8 1971 11 20 21.31.00 8907 122Cass Ia-O ---- 40m no B=17.2 1971 11 23 19.15.00 8908 122Cass Ia-O ---- 60m no B=18.8 1971 11 24 22.54.00 4976 Sc67/92 103a-O GG13 30m no B=17.8 1971 11 24 22.55.00 8909 122Cass 103a-O ---- 60m no B=17.2 1971 11 26 19.14.00 8910 122Cass Ia-O ---- 60m no B=18.6 1971 12 05 18.05.00 8911 122Cass Ia-O ---- 60m no B=18.0 1971 12 06 18.14.00 5006 Sc67/92 Ia-O GG13 30m no B=17.8 1971 12 07 17.33.00 8914 122Cass Ia-O ---- 60m no B=17.8 1971 12 08 19.29.00 5024 Sc67/92 Ia-O GG13 30m no B=17.2 1971 12 10 20.30.00 8915 122Cass Ia-O ---- 20m no B=17.2 1971 12 10 22.00.00 5043 Sc67/92 Ia-O GG13 30m no B=17.8 1971 12 12 18.50.00 5067 Sc67/92 Ia-O GG13 30m no B=17.8 1971 12 12 20.35.00 8916 122Cass Ia-O ---- 60m no B=17.8 1971 12 14 21.01.00 5086 Sc67/92 Ia-O GG13 30m no B=17.8 1971 12 14 22.59.00 8917 122Newt 103a-O ---- 13m no B=18.8 1971 12 14 23.20.00 8918 122Newt 103a-O ---- 20m no B=18.8 1971 12 16 17.13.00 8925 122Newt 103a-O ---- 20m no B=20.2 1971 12 16 18.56.00 5107 Sc67/92 103a-O GG13 30m no B=18.2 1971 12 17 17.09.00 8933 122Newt 103a-O ---- 10m no B=20.2 1971 12 17 17.33.00 8934 122Newt 103a-O ---- 30m no B=20.4 1971 12 18 17.19.00 5129 Sc67/92 103a-O GG13 30m no B=18.4 1971 12 20 17.28.00 8945 122Newt 103a-O ---- 30m no B=20.2 1971 12 20 17.51.00 8946 122Newt 103a-O ---- 10m no B=18.3 1971 12 20 18.35.00 5145 Sc67/92 103a-O GG13 30m no B=17.2 1971 12 21 18.55.00 8947 122Newt 103a-O ---- 30m no B=19.8 1971 12 21 19.16.00 8948 122Newt 103a-O ---- 10m no B=18.6 1971 12 22 22.04.00 5161 Sc67/92 103a-O GG13 30m no B=17.8 1972 01 03 18.20.00 5170 Sc67/92 103a-O GG13 30m no B=17.8 1972 01 07 20.59.00 5174 Sc67/92 103a-O GG13 30m no B=17.8 1972 01 11 19.09.00 8959 122Newt 103a-O ---- 30m no B=19.9 1972 01 11 19.32.00 8960 122Newt 103a-O ---- 15m no B=19.9 1972 01 15 19.30.00 5210 Sc67/92 103a-O GG13 30m no B=17.8 1972 07 14 23.10.00 5450 Sc67/92 103a-O ---- 08m no B=18.2 1972 08 03 22.39.00 5461 Sc67/92 103a-O ---- 15m no B=18.1 1972 08 04 23.19.00 9011 122Newt 103a-O ---- 30m no B=18.8 1972 08 05 00.02.00 5471 Sc67/92 103a-O GG13 20m no B=18.4 1972 08 09 23.14.00 9014 122Newt 103a-O GG13 30m no B=19.8 1972 08 11 01.10.00 5504 Sc67/92 103a-O GG13 20m no B=18.2 1972 08 12 02.30.00 9016 122Newt 103a-O ---- 30m no B=19.8 1972 08 16 01.37.00 5548 Sc67/92 103a-O GG13 20m no B=18.4 1972 08 17 01.35.00 9017 122Newt 103a-O ---- 30m no B=19.9 1972 08 18 01.17.00 9019 122Newt 103a-O ---- 10m no B=14.5 1972 09 05 01.40.00 5589 Sc67/92 103a-O ---- 11m no B=17.8 1972 09 10 01.03.00 5603 Sc67/92 103a-O ---- 18m no B=18.0 1972 09 12 02.39.00 9028 122Newt 103a-O ---- 20m no B=17.9 1972 09 16 23.18.00 9029 122Newt 103a-O ---- 30m no B=20.4 1972 09 16 23.46.00 9030 122Newt 103a-O ---- 10m no B=20.4 1972 10 04 18.35.00 9032 122Newt 103a-O ---- 10m no B=19.8 1972 10 04 19.00.00 9033 122Newt 103a-O ---- 30m no B=19.9 1972 10 05 23.58.00 5658 Sc67/92 103a-O ---- 20m no B=18.6 1972 10 16 23.28.00 5694 Sc67/92 103a-O GG13 20m no B=18.1 1972 10 17 03.24.00 9050 122Newt 103a-O ---- 20m no B=19.9 1972 10 18 02.20.00 9053 122Newt 103a-O ---- 10m no B=19.8 1972 10 25 19.19.00 9054 122Cass 103a-O ---- 40m no B=17.8 1972 10 30 21.34.00 5713 Sc67/92 103a-O ---- 15m no B=18.3 1972 10 30 23.41.00 9055 122Cass 103a-O ---- 50m no B=17.2 1972 11 01 22.24.00 9056 122Newt 103a-O ---- 10m no B=19.9 1972 11 01 22.44.00 9057 122Newt IIa-O ---- 20m no B=20.2 1972 11 03 19.17.00 9067 122Newt 103a-O ---- 20m no B=20.1 1972 11 04 18.08.00 9069 122Newt 103a-O ---- 15m no B=19.8 1972 11 05 19.40.00 9075 122Newt 103a-O ---- 20m no B=20.1 1972 11 05 19.56.00 5791 Sc67/92 103a-O GG13 20m no B=18.4 1972 11 06 20.06.00 9079 122Newt 103a-O ---- 08m no B=19.3 1972 11 06 20.21.00 9080 122Newt 103a-O ---- 20m no B=20.1 1972 11 06 20.47.00 5830 Sc67/92 103a-D GG14 20m no V=17.4 1972 11 08 22.52.00 9085 122Newt IIa-O ---- 15m no B=19.9 1972 11 09 20.07.00 5858 Sc67/92 103a-O ---- 20m no B=18.3 1972 11 11 22.16.00 9090 122Newt 103a-O ---- 20m no B=19.8 1972 11 11 22.31.00 9091 122Newt 103a-O ---- 07m no B=17.9 1972 11 27 19.39.00 9097 122Cass 103a-O ---- 60m no B=18.4 1972 11 29 21.05.00 9098 122Newt 103a-O ---- 20m no B=20.4 1972 12 05 18.35.00 5946 Sc67/92 103a-O ---- 20m no B=18.1 1972 12 06 18.53.00 9100 122Newt 103a-O ---- 20m no B=19.8 1972 12 06 19.11.00 9101 122Newt 103a-O ---- 10m no B=19.8 1972 12 07 20.00.00 5974 Sc67/92 103a-O ---- 20m no B=17.8 1972 12 07 20.25.00 9104 122Newt 103a-O ---- 15m no B=18.6 1972 12 11 21.06.00 9116 122Newt 103a-O ---- 30m no B=20.4 1972 12 11 21.27.00 9117 122Newt 103a-O ---- 10m no B=19.3 1972 12 11 21.44.00 5983 Sc67/92 103a-O ---- 20m no B=18.1 1972 12 13 23.53.00 6006 Sc67/92 103a-O ---- 20m no B=17.8 1972 12 22 18.11.00 6017 Sc67/92 103a-O ---- 20m no B=17.8 1973 01 06 19.24.00 6070 Sc67/92 103a-D GG14 15m no V=17.6 1973 01 08 17.27.00 9165 122Newt 103a-O ---- 15m no B=19.9 1973 01 08 21.38.00 6092 Sc67/92 103a-D GG14 20m no V=17.6 1973 01 09 17.38.00 9174 122Newt 103a-O ---- 15m no B=19.8 1973 01 10 17.16.00 9176 122Newt 103a-O ---- 15m no B=18.6 1973 01 29 18.15.00 9186 122Newt 103a-O ---- 10m no B=19.8 1973 01 29 18.37.00 9187 122Newt 103a-O ---- 30m no B=20.2 1973 01 30 18.20.00 9193 122Newt 103a-O ---- 15m no B=20.2 1973 02 06 18.14.00 9200 122Newt 103a-O ---- 15m no B=19.8 1973 08 06 01.00.00 31 182 103a-O ---- 30m no B=20.4 1973 08 07 00.06 00 6549 Sc67/92 103a-O GG13 15m no B=17.8 1973 08 07 00.17.00 35 182 103a-O ---- 18m no B=??? 1973 08 07 00.25.00 36 182 103a-O ---- 30m no B=??? 1973 08 09 23.30.00 41 182 103a-O ---- 30m no B=20.4 1973 08 25 01.34.00 52 182 103a-O ---- 80m no B=20.4 1973 09 01 22.27.00 57 182 103a-O GG13 30m no B=20.4 1973 09 02 02.19.00 6586 Sc67/92 103a-O GG13 30m no B=18.2 1973 09 03 23.39.00 67 182 103a-O ---- 30m no B=20.4 1973 09 04 02.36.00 6601 Sc67/92 103a-O ---- 30m no B=18.4 1973 09 04 23.39.00 72 182 103a-O ---- 30m no B=20.4 1973 09 09 01.52.00 78 182 103a-O ---- 30m no B=20.4 1973 09 27 23.48.00 85 182 103a-O ---- 40m no B=20.4 1973 09 28 23.29.00 88 182 103a-O ---- 40m no B=20.4 1973 09 29 01.34.00 6660 Sc67/92 103a-O GG13 15m no B=18.0 1973 10 03 23.00.00 96 182 103a-O ---- 30m no B=20.4 1973 10 03 23.07.00 6682 Sc67/92 103a-D GG14 15m no V=18.0 1973 10 03 23.28.00 6683 Sc67/92 103a-O GG13 15m no B=18.4 1973 10 04 23.20.00 102 182 103a-O ---- 30m no B=19.9 1973 10 17 22.20.00 113 182 103a-O ---- 30m no B=20.2 1973 10 19 00.37.00 120 182 103a-O ---- 40m no B=20.1 1973 10 19 22.02.00 126 182 103a-O ---- 30m no B=20.4 1973 10 19 22.30.00 6724 Sc67/92 103a-O GG13 30m no B=18.0 1973 10 20 23.02.00 130 182 103a-O ---- 30m no B=19.9 1973 10 22 23.59.00 136 182 103a-O ---- 30m no B=20.4 1973 10 24 21.55.00 141 182 103a-O ---- 30m no B=20.2 1973 10 25 23.23.00 6781 Sc67/92 103a-O GG13 20m no B=17.2 1973 10 25 23.56.00 153 182 103a-O GG13 30m no B=18.8 1973 10 25 23.56.00 154 182 103a-O ---- 30m no B=20.4 1973 10 26 23.47.00 6793 Sc67/92 103a-O GG13 20m no B=18.0 1973 10 28 20.15.00 176 182 103a-O GG13 30m no B=18.8 1973 10 28 21.05.00 177 182 103a-O ---- 30m no B=20.4 1973 10 29 19.34.00 182 182 103a-O GG13 30m no B=18.8 1973 10 29 22.20.00 6826 Sc67/92 103a-O GG13 20m no B=18.4 1973 10 30 21.40.00 189 182 103a-O ---- 30m no B=20.4 1973 11 02 19.27.00 207 182 103a-D GG14 30m no V=19.7 1973 11 03 00.07.00 6863 Sc67/92 103a-D GG14 20m no V=17.6 1973 11 03 00.33.00 6864 Sc67/92 103a-O GG13 20m no B=17.8 1973 11 14 18.57.00 228 182 103a-O GG13 30m no B=20.4 1973 11 15 21.36.00 233 182 103a-D GG14 30m no V=19.7 1973 11 16 21.16.00 235 182 103a-D GG14 30m no V=18.6 1973 11 18 20.27.00 243 182 103a-D GG14 20m no V=18.1 1973 11 19 22.08.00 245 182 103a-O GG13 30m no B=19.3 1973 11 22 20.56.00 257 182 103a-D GG14 30m no V=19.7 1973 11 23 20.34.00 263 182 103a-O GG13 30m no B=19.9 1973 11 25 20.07.00 276 182 103a-D GG14 30m no V=19.7 1973 11 27 19.59.00 284 182 103a-O GG13 30m no B=19.8 1973 11 28 19.24.00 287 182 103a-D GG14 30m no V=19.8 1973 11 29 20.32.00 295 182 103a-O GG13 30m no B=20.4 1973 11 30 22.14.00 297 182 103a-D GG14 40m no V=19.8 1973 12 01 17.31.00 302 182 103a-O GG13 30m no B=20.4 1973 12 03 22.06.00 312 182 103a-O GG13 30m no B=20.4 1973 12 13 18.10.00 325 182 103a-O GG13 30m no B=19.9 1973 12 15 19.05.00 332 182 103a-D GG14 30m no V=19.3 1973 12 17 19.02.00 337 182 103a-O GG13 30m no B=20.2 1973 12 26 17.30.00 353 182 103a-O ---- 40m no B=20.4 1973 12 28 18.49.00 369 182 103a-D ---- 30m no V=19.8 1974 01 15 20.37.00 380 182 103a-O GG13 15m no B=18.6 1974 01 16 17.54.00 381 182 103a-O GG13 30m no B=19.9 1974 01 17 18.06.00 389 182 103a-O ---- 30m no B=19.8 1974 01 19 18.51.00 392 182 103a-O ---- 30m no B=19.9 1974 01 20 18.55.00 396 182 103a-O GG13 30m no B=19.9 1974 01 20 20.04.00 397 182 103a-D GG14 40m no V=19.8 1974 01 23 19.15.00 426 182 103a-O GG13 30m no B=20.4 1974 01 25 21.12.00 439 182 103a-O GG13 30m no B=20.2 1974 01 28 18.18.00 444 182 103a-O GG13 30m no B=20.4 1974 07 17 00.30.00 7259 Sc67/92 103a-O GG13 20m no B=17.8 1974 07 17 01.45.00 9305 122Newt 103a-O ---- 25m no B=18.4 1974 07 23 01.13.00 552 182 103a-O ---- 30m no B=20.2 1974 07 26 01.55.00 555 182 103a-O GG13 25m no B=19.9 1974 07 27 01.00.00 558 182 103a-O GG13 30m no B=19.9 1974 08 12 23.15.00 7308 Sc67/92 103a-O GG13 20m no B=18.4 1974 08 15 02.04.00 575 182 103a-O GG13 30m no B=19.9 1974 08 17 00.48.00 588 182 103a-O GG13 30m no B=19.9 1974 08 19 01.30.00 599 182 103a-O GG13 30m no B=19.3 1974 08 21 23.45.00 604 182 103a-O GG13 30m no B=19.3 1974 09 09 00.35.00 628 182 103a-O GG13 30m no B=20.4 1974 09 10 22.22.00 7400 Sc67/92 103a-O GG13 08m no B=15.8 1974 09 12 00.16.00 639 182 103a-O GG13 30m no B=20.4 1974 09 13 00.04.00 7421 Sc67/92 103a-O GG13 30m no B=18.6 1974 09 15 00.22.00 662 182 103a-O GG13 30m no B=20.4 1974 09 19 00.15.00 692 182 103a-O GG13 30m no B=20.4 1974 09 26 01.37.00 7474 Sc67/92 103a-O GG13 30m no B=18.1 1974 09 26 01.45.00 693 182 103a-O GG13 30m no B=19.9 1974 10 09 23.27.00 697 182 103a-O GG13 30m no B=20.4 1974 10 16 22.37.00 703 182 103a-O GG13 30m no B=20.4 1974 10 17 01.20.00 7506 Sc67/92 103a-O GG13 30m no B=17.8 1974 10 21 22.51.00 726 182 103a-O GG13 20m no B=19.8 1974 10 22 22.28.00 730 182 103a-O GG13 30m no B=20.4 1974 11 06 20.19.00 7563 Sc67/92 103a-O GG13 30m no B=18.4 1974 11 09 00.27.00 756 182 103a-O GG13 30m no B=20.4 1974 11 11 21.48.00 7596 Sc67/92 103a-O GG13 20m no B=18.2 1974 11 11 22.54.00 775 182 103a-O GG13 17m no B=19.8 1974 11 17 21.40.00 7601 Sc67/92 103a-O GG13 20m no B=18.0 1974 11 17 21.55.00 776 182 103a-O GG13 30m no B=20.2 1974 12 03 19.22.00 7623 Sc67/92 103a-O GG13 30m no B=18.0 1974 12 09 21.17.00 7661 Sc67/92 103a-O GG13 20m no B=17.8 1974 12 12 19.15.00 805 182 103a-O GG13 30m no B=19.8 1974 12 13 19.33.00 7674 Sc67/92 103a-O GG13 06m no B=17.2 1974 12 14 19.22.00 7678 Sc67/92 103a-O GG13 30m no B=18.0 1974 12 15 19.29.00 819 182 103a-O GG13 30m no B=20.4 1974 12 17 17.56.00 839 182 103a-O GG13 30m no B=19.8 1974 12 18 21.46.00 7723 Sc67/92 103a-O GG13 30m no B=17.8 1975 01 03 17.51.00 7751 Sc67/92 103a-O GG13 30m no B=18.6 1975 01 03 20.26.00 854 182 103a-O GG13 30m no B=20.4 1975 01 08 21.04.00 7774 Sc67/92 103a-O GG13 30m no B=17.8 1975 01 09 19.56.00 7777 Sc67/92 103a-O GG13 30m no B=18.0 1975 01 11 17.44.00 886 182 103a-O GG13 30m no B=20.4 1975 01 13 18.11.00 7801 Sc67/92 103a-O GG13 30m no B=17.8 1975 01 14 18.11.00 902 182 103a-O GG13 30m no B=20.4 1975 01 29 18.26.00 907 182 103a-O GG13 30m no B=20.4 1975 02 05 18.24.00 7823 Sc67/92 103a-O GG13 30m no B=18.4 1975 02 08 19.23.00 7853 Sc67/92 103a-O GG13 30m no B=17.8 1975 05 19 01.57.00 977 182 103a-O ---- 20m no B=19.8 1975 08 10 00.45.00 8013 Sc67/92 103a-O GG13 30m no B=19.3 1975 10 02 23.03.00 8094 Sc67/92 103a-O GG13 30m no B=19.3 1975 10 06 00.55.00 1058 182 103a-O ---- 16m no B=18.6 1975 10 06 21.55.00 8135 Sc67/92 103a-O GG13 30m no B=18.6 1975 10 06 23.32.00 1060 182 103a-O ---- 30m no B=20.4 1975 10 26 19.57.00 1064 182 103a-O ---- 30m no B=19.9 1975 10 30 22.31.00 8191 Sc67/92 103a-O GG13 30m no B=18.1 1975 11 29 18.45.00 8205 Sc67/92 103a-O GG13 30m no B=18.4 1975 12 04 19.08.00 1102 182 103a-O ---- 30m no B=20.2 1975 12 05 20.49.00 1110 182 103a-O ---- 30m no B=20.4 1975 12 06 19.24.00 1119 182 103a-O ---- 30m no B=19.3 1975 12 06 21.40.00 8235 Sc67/92 103a-O GG13 30m no B=18.1 1975 12 08 18.52.00 1132 182 103a-O ---- 30m no B=18.6 1975 12 23 20.08.00 1140 182 103a-O ---- 30m no B=20.2 1975 12 23 20.35.00 1141 182 103a-O ---- 20m no B=20.2 1975 12 26 21.34.00 1149 182 103a-O ---- 30m no B=19.3 1975 12 29 19.40.00 1169 182 103a-O ---- 40m no B=20.4 1975 12 31 18.07.00 1173 182 103a-O ---- 40m no B=19.9 1976 01 02 18.29.00 1174 182 103a-O ---- 37m no B=19.3 1976 01 02 19.27.00 8259 Sc67/92 103a-O GG13 20m no B=17.8 1976 01 04 20.43.00 8278 Sc67/92 103a-O GG13 20m no B=18.4 1976 01 06 17.43.00 1175 182 103a-O ---- 35m no B=20.2 1976 01 21 18.06.00 8312 Sc67/92 103a-O GG13 30m no B=17.8 1976 01 28 18.02.00 1180 182 103a-O ---- 30m no B=19.8 1976 01 28 19.43.00 8350 Sc67/92 103a-O GG13 30m no B=17.8 1976 02 03 18.07.00 1184 182 103a-O ---- 30m no B=20.4 1976 02 07 18.34.00 1186 182 103a-O GG13 30m no B=18.6 1976 08 21 00.14.00 8668 Sc67/92 103a-O GG13 30m no B=18.4 1976 08 23 23.52.00 1316 182 IIIa-Jaz ---- 19m no B=17.2 1976 09 17 21.50.00 1320 182 103a-O ---- 40m no B=20.4 1976 09 18 22.05.00 8690 Sc67/92 103-aE RG630 60m no R=16.9 1976 09 20 23.36.00 1326 182 103a-O ---- 30m no B=19.9 1976 09 21 00.09.00 1327 182 103a-O ---- 18m no B=19.8 1976 09 23 23.30.00 1332 182 103a-O ---- 30m no B=19.9 1976 10 18 20.31.00 8707 Sc67/92 103a-O GG13 15m no B=17.8 1976 10 20 19.49.00 1342 182 103a-O ---- 30m no B=19.9 1976 10 21 00.30.00 8711 Sc67/92 103a-O GG13 30m no B=18.0 1976 10 23 21.45.00 8737 Sc67/92 103a-O GG13 30m no B=17.2 1976 11 16 18.04 00 1354 182 103a-O ---- 30m no B=19.8 1976 11 18 23.28.00 8753 Sc67/92 103a-O GG13 30m no B=17.8 1976 11 24 17.40.00 1356 182 103a-O ---- 30m no B=20.1 1976 11 27 23.02.00 1360 182 103a-O ---- 15m no B=19.9 1976 11 27 23.29.00 1361 182 103a-O ---- 30m no B=20.2 1976 12 13 17.45.00 1407 182 103a-O ---- 30m no B=20.2 1976 12 13 20.40.00 8787 Sc67/92 103a-O GG13 30m no B=17.8 1976 12 22 18.24.00 1427 182 103a-O ---- 30m no B=20.4 1976 12 23 17.50.00 1437 182 103a-O ---- 30m no B=20.2 1976 12 26 22.04.00 8842 Sc67/92 103a-O GG13 15m no B=17.8 1977 01 17 19.59.00 8879 Sc67/92 103a-O GG13 30m no B=17.8 1977 01 18 18.45.00 1466 182 103a-O ---- 30m no B=19.8 1977 07 12 01.34.00 9078 Sc67/92 103a-O GG13 20m no B=16.6 1977 08 11 00.10.00 9351 122Newt 103a-O ---- 30m no B=19.8 1977 08 11 00.50.00 9352 122Newt 103a-O ---- 10m no B=19.3 1977 08 14 00.05.00 1602 182 103a-O ---- 40m no B=19.8 1977 09 08 00.20.00 9184 Sc67/92 103a-O GG13 30m no B=18.4 1977 10 03 20.42.00 1627 182 103a-O ---- 40m no B=19.9 1977 10 12 20.40.00 1637 182 103a-O ---- 40m no B=20.4 1977 10 12 23.12.00 9243 Sc67/92 103a-O GG13 20m no B=18.6 1977 11 06 22.50.00 9281 Sc67/92 103a-O GG13 30m no B=17.8 1977 11 11 21.06.00 1716 182 103a-O ---- 35m no B=20.4 1977 11 13 00.30.00 1723 182 103a-O ---- 30m no B=19.3 1977 11 14 22.07.00 9318 Sc67/92 103a-O GG13 30m no B=17.8 1977 12 02 21.20.00 1747 182 103a-O ---- 40m no B=19.9 1977 12 04 17.44.00 1750 182 103a-O ---- 40m no B=19.9 1977 12 04 18.15.00 1751 182 103a-Oidr ---- 20m no B=19.9 1977 12 04 19.09.00 1752 182 IN+4fl RG5 40m no I=17.3 1977 12 04 22.02.00 9356 Sc67/92 103a-O GG13 30m no B=18.4 1977 12 07 20.52.00 1772 182 103a-O ---- 40m no B=19.9 1977 12 07 21.32.00 9371 Sc67/92 103a-O GG13 07m no B=17.8 1977 12 28 18.17.00 1789 182 103a-O ---- 40m no B=19.3 1977 12 29 18.46.00 1792 182 103a-Oidr ---- 30m no B=19.9 1978 01 03 19.27.00 9402 Sc67/92 103a-O GG13 30m no B=17.8 1978 01 04 17.44.00 1801 182 103a-O ---- 40m no B=19.3 1978 01 06 18.37.00 1812 182 103a-O ---- 40m no B=19.4 1978 01 06 20.56.00 9421 Sc67/92 IIIa-Jarr GG13 90m no B=17.8 1978 01 08 19.33.00 1842 182 103a-O ---- 40m no B=19.9 1978 06 05 01.00.00 9425 122Newt 103a-O ---- 30m no B=17.8 1978 06 05 01.20.00 9426 122Newt 103a-O ---- 10m no B=17.8 1978 09 01 23.42.00 2138 182 103a-O ---- 40m no B=19.9 1978 09 01 23.55.00 9620 Sc67/92 103a-O GG13 30m no B=18.4 1978 09 24 23.49.00 2190 182 103a-O ---- 40m no B=18.6 1978 09 28 20.20.00 9427 122Newt 103a-O ---- 30m no B=18.6 1978 09 28 20.41.00 9428 122Newt 103a-O ---- 10m no B=17.8 1978 10 05 21.59.00 9633 Sc67/92 103a-O GG13 30m no B=18.0 1978 10 07 22.57.00 9654 Sc67/92 103a-E RG1 30m no R=17.2 1978 10 10 01.35.00 9666 Sc67/92 103a-E RG630 60m no R=17.2 1978 10 10 02.30.00 9667 Sc67/92 103a-D OG530 30m no V=17.6 1978 10 23 22.42.00 2244 182 103a-O ---- 40m no B=19.8 1978 10 28 22.31.00 9688 Sc67/92 103a-O GG13 30m no B=17.8 1978 10 30 19.37.00 2302 182 103a-O ---- 30m no B=19.9 1978 10 30 22.05.00 9701 Sc67/92 IIIa-Jarr GG13 30m no B=19.8 1978 11 01 21.13.00 9454 122Newt IIa-O ---- 16m no B=19.8 1978 11 03 23.15.00 9725 Sc67/92 IIIa-Jarr GG13 60m no B=19.3 1978 11 21 20.49.00 9771 Sc67/92 103a-O GG13 40m no B=17.8 1978 12 02 21.34.00 9827 Sc67/92 103a-O GG13 40m no B=18.0 1979 01 02 22.00.00 9872 Sc67/92 103a-O GG13 30m no B=16.6 1979 01 19 18.16.00 9888 Sc67/92 103a-O GG13 30m no B=17.8 1979 07 18 00.00.00 9463 122Newt 103a-O ---- 20m no B=17.8 1979 08 21 23.18.00 2454 182 103a-O ---- 40m no B=19.9 1979 08 29 01.25.00 10153 Sc67/92 103a-O GG13 30m no B=18.6 1979 09 27 22.26.00 10192 Sc67/92 103a-O ---- 30m no B=18.4 1979 10 23 23.55.00 9467 122Newt 103a-O ---- 40m no B=18.4 1979 10 24 00.03.00 10234 Sc67/92 103a-O GG13 40m no B=17.8 1979 11 20 19.48.00 2475 182 103a-O GG13 30m no B=19.9 1979 11 23 21.02.00 9469 122Newt 103a-O ---- 40m no B=20.2 1979 11 24 21.23.00 2503 182 103a-O ---- 30m no B=20.2 1980 01 10 18.41.00 10356 Sc67/92 103a-O ---- 30m no B=18.0 1980 01 18 19.42.00 10379 Sc67/92 103a-O ---- 30m no B=17.8 1980 09 04 00.19.00 10601 Sc67/92 103a-O ---- 30m no B=18.2 1980 09 30 23.13.00 2713 182 103a-O ---- 30m no B=19.8 1980 10 10 23.57.00 9487 122Newt 103a-O ---- 40m no B=19.9 1980 12 14 00.01.00 10727 Sc67/92 103a-O ---- 30m no B=17.8 1980 12 24 18.33.00 2753 182 103a-O ---- 25m no B=20.2 1980 12 25 18.00.00 2754 182 103a-O ---- 30m no B=19.9 1981 01 02 17.37.00 2762 182 103a-O ---- 30m no B=19.3 1981 02 05 20.22.00 10891 Sc67/92 103a-O ---- 30m no B=17.2 1981 07 06 23.53.00 2925 182 TriXpan+ITT ---- 08m no V=17.9 1981 08 25 00.26.00 2983 182 103a-O ---- 30m no B=18.6 1981 09 29 22.30.00 11115 Sc67/92 103a-O ---- 40m no B=16.6 1981 10 24 23.42.00 9545 122Newt 103a-O ---- 30m no B=19.3 1981 10 27 21.58.00 9546 122Newt 103a-O ---- 14m no B=18.4 1981 10 28 22.56.00 9560 122Newt 103a-O ---- 30m no B=19.8 1981 10 29 00.20.00 3012 182 103a-O GG13 40m no B=19.3 1981 11 17 21.19.00 11193 Sc67/92 103a-O ---- 30m no B=17.8 1981 11 26 21.32.00 3038 182 103a-O ---- 40m no B=19.9 1981 11 28 22.04.00 9566 122Newt 103a-O ---- 07m no B=17.8 1981 11 29 20.42.00 9567 122Newt 103a-O ---- 30m no B=19.3 1981 12 16 19.59.00 11286 Sc67/92 103a-O ---- 30m no B=18.2 1981 12 26 17.34.00 3062 182 103a-O ---- 45m no B=19.9 1982 08 18 23.52.00 3170 182 103a-O GG13 40m no B=19.9 1982 08 25 01.24.00 3180 182 103a-O ---- 30m no B=20.4 1982 08 26 00.22.00 11628 Sc67/92 103a-O ---- 30m no B=18.6 1982 09 15 23.50.00 11662 Sc67/92 103a-O ---- 30m no B=18.6 1982 09 17 00.35.00 3191 182 103a-O ---- 40m no B=20.2 1982 09 17 23.39.00 3198 182 103a-O ---- 30m no B=20.2 1982 09 18 21.57.00 3202 182 103a-O ---- 30m no B=19.3 1982 10 14 22.38.00 3211 182 103a-O ---- 40m no B=20.4 1982 10 15 23.09.00 3216 182 103a-O ---- 15m no B=19.3 1982 10 15 23.25.00 11705 Sc67/92 103a-O ---- 40m no B=17.8 1982 10 16 21.57.00 3219 182 103a-O ---- 30m no B=19.9 1982 10 20 22.59.00 11719 Sc67/92 103a-O ---- 45m no B=18.4 1982 11 16 22.35.00 11742 Sc67/92 103a-O ---- 40m no B=17.8 1982 12 09 19 57.00 11779 Sc67/92 103a-O ---- 30m no B=17.8 1983 01 05 19.00.00 3223 182 103a-O ---- 30m no B=18.6 1983 01 06 17.55.00 3224 182 103a-O ---- 40m no B=20.4 1983 01 10 21.54.00 3249 182 103a-O ---- 40m no B=20.4 1983 08 09 22.52.00 12169 Sc67/92 103a-O ---- 30m no B=17.8 1983 09 05 00.00.00 12189 Sc67/92 103a-O ---- 40m no B=17.8 1983 09 06 00.33.00 12195 Sc67/92 103a-O ---- 40m no B=18.2 1983 09 08 23.24.00 3338 182 103a-O ---- 40m no B=19.9 1983 09 08 23.48.00 12199 Sc67/92 103a-O ---- 40m no B=17.8 1983 10 02 23.33.00 12222 Sc67/92 103a-O ---- 30m no B=18.4 1983 10 09 23.07.00 12235 Sc67/92 103a-O ---- 30m no B=17.8 1983 10 28 20.45.00 12260 Sc67/92 103a-O ---- 30m no B=17.8 1983 10 31 22.26.00 3396 182 103a-O ---- 40m no B=20.2 1983 11 30 00.30.00 3425 182 103a-O ---- 40m no B=19.9 1983 12 03 20.04.00 12371 Sc67/92 103a-D GG14 30m no V=17.2 1983 12 05 20.32.00 3438 182 103a-O ---- 40m no B=20.4 1984 01 04 21.01.00 12393 Sc67/92 IIIa-Jarr ---- 30m no B=17.8 1984 01 05 20.54.00 12397 Sc67/92 IIIa-Jarr GG13 60m no B=18.2 1984 01 29 20.28.00 12431 Sc67/92 IIIa-Jarr GG13 40m no B=17.8 1984 07 27 02.00.00 12547 Sc67/92 103a-O GG13 40m no B=17.2 1984 07 28 00.48.00 3515 182 103a-O GG13 40m no B=18.6 1984 07 31 01.29.00 3530 182 103a-O ---- 40m no B=20.4 1984 08 02 23.13.00 12565 Sc67/92 103a-O ---- 40m -- ------ 1984 08 04 01.00.00 12571 Sc67/92 103a-O GG13 30m no B=18.6 1984 10 02 23.48.00 12606 Sc67/92 103a-O ---- 40m no B=17.8 1984 10 28 23.43.00 12622 Sc67/92 103a-O ---- 40m no B=17.8 1984 11 01 00.10.00 12638 Sc67/92 103a-O ---- 40m no B=17.2 1984 11 02 00.40.00 3534 182 103a-O ---- 40m no B=20.4 1984 11 02 22.06.00 3537 182 103a-O GG13 30m no B=20.2 1984 11 21 22.20.00 12662 Sc67/92 103a-O ---- 45m no B=17.8 1984 11 23 20.38.00 3542 182 103a-O ---- 40m no B=20.4 1984 11 30 20.45.00 3548 182 103a-O GG13 30m no B=19.8 1984 12 20 20.14.00 12713 Sc67/92 103a-O GG13 30m no B=17.8 1984 12 21 19.20.00 12720 Sc67/92 103a-O GG13 30m no B=17.8 1984 12 23 18.03.00 3557 182 103a-O ---- 40m no B=19.9 1984 12 26 22.08.00 3568 182 103a-O ---- 40m no B=20.4 1984 12 26 22.55.00 3569 182 103a-O ---- 10m no B=19.3 1985 07 22 00.18.00 3617 182 103a-O ---- 40m no B=18.8 1985 08 14 00.31.00 12923 Sc67/92 103a-O ---- 40m no B=18.4 1985 08 16 00.55.00 12933 Sc67/92 103a-O ---- 40m no B=18.0 1985 08 19 23.56.00 3652 182 103a-O ---- 40m no B=20.4 1985 09 14 23.02.00 3659 182 103a-O ---- 45m no B=20.4 1985 09 16 23.18.00 3661 182 103a-O ---- 45m no B=20.4 1985 09 19 20.06.00 13030 Sc67/92 103a-O GG13 30m no B=17.8 1985 11 04 21.25.00 13097 Sc67/92 103a-O ---- 40m no B=16.6 1985 11 06 22 20 00 3681 182 103a-O ---- 45m no B=20.4 1985 11 06 22.50.00 3682 182 103a-O ---- 15m no B=19.8 1985 11 08 23.03.00 3694 182 103a-O ---- 40m no B=20.4 1985 11 15 23.29.00 13131 Sc67/92 103a-O ---- 40m no B=17.8 1985 12 03 21.09.00 13155 Sc67/92 103a-O ---- 40m no B=17.2 1986 01 16 20.17.00 3709 182 103a-O ---- 20m no B=18.4 1986 01 17 18.43.00 3717 182 103a-O ---- 20m no B=19.8 1986 01 17 19.45.00 3716 182 103a-O ---- 45m no B=19.8 1986 03 05 19.15.00 16771 Sc40/50 EKTA64 ---- 90m no V=16.5 1986 07 11 01.10.00 3758 182 103a-O ---- 30m no B=19.3 1986 08 13 00.02.00 3760 182 103a-O GG13 40m no B=20.4 1986 09 29 23.26.00 13414 Sc67/92 103a-O ---- 40m no B=18.2 1986 10 06 19.55.00 13458 Sc67/92 103a-O ---- 40m no B=18.0 1986 10 08 00.12.00 3775 182 103a-O ---- 60m no B=20.4 1986 10 08 00.59 00 3776 182 103a-O ---- 20m no B=19.3 1986 10 30 22.05.00 13497 Sc67/92 103a-O ---- 40m no B=18.2 1986 11 06 20.27.00 3784 182 103a-O ---- 40m no B=19.8 1986 11 07 21.14.00 3787 182 103a-O GG13 30m no B=19.8 1986 11 07 23.19.00 3790 182 103a-O GG13 30m no B=19.9 1986 11 08 23.19.00 3801 182 103a-O GG13 30m no B=19.3 1986 11 09 00.02.00 3802 182 103a-O GG13 30m no B=19.9 1986 11 09 22.59.00 3809 182 103a-O GG13 30m no B=20.2 1986 11 26 18.52.00 13545 Sc67/92 103a-O ---- 40m no B=17.8 1986 11 26 20.20.00 3813 182 103a-O ---- 40m no B=20.2 1986 11 27 19.27.00 3819 182 103a-O ---- 40m no B=19.9 1986 12 23 17.38.00 3825 182 103a-D GG14 40m no V=19.2 1986 12 27 18.41.00 3832 182 103a-D GG14 40m no V=19.2 1987 01 31 20.25.00 3841 182 103a-D ---- 40m no V=19.8 1987 07 25 02.08 00 9618 122Newt 103a-O GG13 15m no B=17.8 1987 07 26 23.51.00 9619 122Newt 103a-O ---- 30m no B=17.8 1987 08 01 23 44 00 13864 Sc67/92 103a-O ---- 40m no B=18.0 1987 08 28 00.25.00 13879 Sc67/92 103a-O ---- 40m no B=17.8 1987 09 23 23.23.00 13897 Sc67/92 IIa-O ---- 40m no B=17.2 1987 10 19 21.35.00 13916 Sc67/92 103a-O ---- 40m no B=18.4 1987 11 16 22.10.00 13923 Sc67/92 103a-O GG13 20m no B=17.8 1987 12 11 19.55.00 13946 Sc67/92 103a-O ---- 40m no B=18.2 1988 01 16 19.25.00 13990 Sc67/92 103a-E RG1 40m no R=17.2 1988 08 13 00.03.00 14197 Sc67/92 103a-E RG1 30m SI R=17.5 1988 09 08 01.27.00 14222 Sc67/92 103a-E RG1 30m SI R=16.9 1988 10 15 21.22.00 14244 Sc67/92 103a-D GG14 30m no V=18.2 1988 10 16 01.00.00 9631 122Newt 103a-O GG13 40m no B=19.8 1988 11 07 20.34.00 14266 Sc67/92 103a-D GG14 30m no V=17.9 1988 11 16 01.20.00 14293 Sc67/92 103a-E RG1 45m no R=17.6 1988 12 08 19.57.00 14312 Sc67/92 103a-E RG1 45m no R=17.8 1988 12 08 21.20.00 14313 Sc67/92 103a-O GG13 30m no B=19.0 1988 12 08 21.50.00 9643 122Newt 103a-O GG13 20m no B=17.9 1988 12 09 18.00.00 3862 182 103a-O GG13 40m no B=19.8 1988 12 09 19.00.00 3863 182 103a-O GG13 20m no B=18.4 1989 12 02 22.12.45 14745 Sc67/92 103a-O GG13 30m no B=17.8 1991 10 04 18.32.00 15051 Sc67/92 103a-O GG13 20m no B=17.8 1991 10 31 17.58.03 15052 Sc67/92 103a-O GG13 30m no B=17.2 1991 12 06 19.42.00 9702 122Newt 103a-O ---- 10m no B=17.8 1992 01 04 18.37.00 9703 122Newt 103a-O ---- 15m no B=18.4 1992 08 26 23.04.00 9717 122Newt 103a-O ---- 30m no B=18.4 1993 12 11 19.47.47 15694 Sc67/92 Tmax400 ---- 20.5m -- ------ 1993 12 17 18.31.21 15710 Sc67/92 Tmax400 ---- 30m no V=16.5